imageRUNNER ADVANCE C9075S PRO Customer Expectations Document
Page 40
The table below indicates the estimated length of time needed to install the main
unit and optional accessories starting from the time the machine is unpacked to
when it is installed, and calculated from the average amount of manpower hours.
The estimated installation times are based on up to four (4) experienced
technicians.
Description
Estimated Time
Main Unit and Buffer Pass Unit
45 minutes
PRISMAsync Controller
15 minutes
Operator Panel
15 minutes
Operator Attention Light
5 minutes
Duplex Color Image Reader Unit-A1
10 minutes
Paper Deck Unit-A1
15 minutes
POD Deck Lite-A1
17 minutes
Multi-Drawer Paper Deck-A1
20 minutes
Staple Finisher-A1
8 minutes
Booklet Finisher-A1
9 minutes
Puncher Unit-BF1
11 minutes
Staple Finisher-A1 with the Puncher Unit-BF1
11 minutes
Booklet Finisher-A1 with the Puncher Unit-BF1
12 minutes
Document Insertion Unit-H1
8 minutes
Paper Folding Unit-G1
12 minutes
Professional Puncher-C1 & Professional Puncher Integration Unit-B1
18 minutes
Inner Booklet Trimmer-A1
14 minutes
Removable HDD Kit-AB1
25 minutes
3.5inch/1 TB HDD-B1
10 minutes
8.2 Customer Installation Responsibilities
Item
Comment
Identify location for equipment.
Area meets space and service space requirements.
Verify strength of floor and level.
Certified by structural engineers.
Ensure that the equipment can be
delivered to the site.
Path is clear and unobstructed.
Confirm proper electrical outlets and
power are available.
Dedicated power, and enough outlets for equipment
(including accessories).
Area meets environmental
specifications.
Temperature and humidity are within specifications,
venting provided if necessary.
Network connections available.
If desired.