
9
9
9-10
9-10
Installation■>■Installation■Procedure■>■Installing■the■Drum■Unit
Installation■>■Installation■Procedure■>■Installing■the■Drum■Unit
Installation■Procedure
Installing■the■Drum■Unit
1)■Remove■the■ITB■Cover.
•■ 2■screws■(to■loosen)
screw
F-9-14
2)■Check■that■the■ITB■Sub■Pressure■Release■Lever■is■positioned■in■the■direction■of■the■arrow■and■if■not,■turn■it■and■adjust■the■
position.
ITB Sub Pressure
Release Lever
direction
of the arrow
F-9-15
3)■Turn■the■ITB■Pressure■Release■Lever■in■the■direction■of■the■arrow,■and■then■fit■the■projection■to■the■triangle■mark■on■the■
plate■to■release■the■pressure■ITB.
ITB Pressure Release Lever
F-9-16
Содержание IMAGERUNNER ADVANCE C5030
Страница 17: ...1 1 Product Overvew Product Overvew Product Lineup Feature Specification Name of Parts Operation ...
Страница 259: ...3 3 Periodical Service Periodical Service Consumable Parts Replacement Parts and Cleaning Parts ...
Страница 450: ...5 5 Adjustment Adjustment Main Controller Image Formation System Pickup Feed System ...
Страница 575: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code ...
Страница 701: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD ...