
2
2
2-27
2-27
Technology > Controller System > Service Operations > Service precautions
Technology > Controller System > Service Operations > Service precautions
Service Operations
■
Action to take when replacing parts
Part name
Action
Reference
Secondary battery
The secondary battery is powered even after the
main power switch is turned off.
1) Press the SW3 on the main controller.
2) The LED10 on the main controller goes out.
3) Now, you can replace parts.
(
)
SO-DIMM
Main controller PCB Print the set/loaded data.
Install the parts (removed from the old PCB) on the
new PCB. Set/load data again.
(
)
■
Consumables
None.
■
Service precautions
None.
T-2-15
●
Heater operating condition
Cassette
heater
Reader
heater
Drum
heater
Turning on the
environment heater switch
Standby mode
ON
OFF
ON
Printing
ON
OFF
OFF
Turning off the main
power switch
ON
ON
ON
Sleep mode
ON
ON
ON
T-2-14
Содержание imageRUNNER 2535
Страница 15: ...1 1 Product Overview Product Overview Product Lineup Feature Specifications Name of Parts ...
Страница 105: ...3 3 Periodical Service Periodical Service Consumable Parts and Cleaning Parts ...
Страница 177: ...5 5 Adjustment Adjustment Outline Adjustment when replacing parts Image position adjustment ...
Страница 184: ...6 6 Troubleshooting Troubleshooting Initial Check Test Print Troubleshooting items Upgrading Targets and Procedure ...
Страница 195: ...7 7 Error Code Overview Error Code Jam Code Alarm Code ...
Страница 205: ...7 7 7 11 7 11 ...
Страница 211: ...8 8 Service Mode Outline Details of Service Mode ...
Страница 354: ... Service Tools General Circuit Diagram Appendix ...