<Work procedure 2-10>
1 / 12
<Remedy>
ITB Drive Roller [K] Cleaning/Replacement
<Detailed work procedure>
1) Open the Front Left Cover and the Front Right Cover.
Cleaning Procedure
2) Remove Process Unit Cover.
3) Pull Out ITB Unit.
CAUTION:
Be sure to pull out the Fixing Feed Unit and ITB Unit to the position where latch is locked.
Reason: Disengagement between the Positioning Pin of the Secondary Transfer Outer Unit and Shaft
Support Member of the frame body of the ITB Unit becomes insufficient, and it may cause damage when
assembling the Intermediate Transfer Belt Unit.
4) Remove ITB Cleaning Unit.
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......