9
9
9-7
9-7
Installation > Unpacking > Unpacking
Installation > Unpacking > Unpacking
Unpacking
Unpacking
CAUTION :
• This machine weights about 500 kg. Be sure to take extra care for safety
when moving the machine or performing installation.
• Be sure to work in a group of 2 or more people when installing the host
machine.
NOTE:
Dimension of the host machine and the transportation container is shown in
the figure. Secure the unpacking space to work.
970mm
1676mm
1532mm
F-9-13
1) Remove the packing box of the host machine.
2) Remove the fixtures for the host machine.
• 4 pieces each: Nut, Spring washer, Washer and Attaching plate
NOTE:
Prepare the compatible wrench for 17 mm nuts.
F-9-14
Содержание imagePRESS 1110
Страница 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Страница 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Страница 733: ...7 7 Error Code Error Code Overview Location Code Pickup Position Code Pickup size Error Code Jam Code Alarm Code ...
Страница 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Страница 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...