7
7
7-38
7-38
Installation > Adjustment > Side Registration/Skew Adjustment > Checking Adjustment Value
Installation > Adjustment > Side Registration/Skew Adjustment > Checking Adjustment Value
9) Rotate the Adjusting Bolt with the spaner. Adjust the height (that was measured in step 6))
to be within 86.3 +/- 0.3 mm.
• To increase the height : rotate in the direction of [A].
• To lower the height : rotate in the direction of [B].
(Height increment per rotation : approx.1.75 mm)
[A]
[B]
Adjusting Bolt
10)
Tighten the Fixing Nut in the direction of [B].
[B]
Fixing Nut
11)
Adjust the other 3 casters as well (by repeating the steps above).
12)
Reconnect the Finisher with the upstream equipment and check the height.
Install the removed parts such as covers if the height difference is /- 2mm.
If not, repeat the steps above to readjust the height.
F-7-107
F-7-108
Side Registration/Skew Adjustment
CAUTION:
Only when the Puncher Unit is installed to the Finisher, perform this item.
■
Checking Adjustment Value
●
Preparations
1) Turn ON the power of the finisher then the host machine.
2) Open the Finisher Front Cover and put the Door Switch Tool into the door switch.
F-7-109
Содержание Finisher-AK1
Страница 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Страница 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Страница 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Страница 172: ...5 5 Adjustment Adjustment Basic Adjustment Adjustment at Time of Parts Replacement Auxiliary Adjustment ...
Страница 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Страница 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...