9
9
9-5
9-5
Installation > Drum Heater-D1 > Installation Procedure > Before Installing
Installation > Drum Heater-D1 > Installation Procedure > Before Installing
■
Before Installing
1) Turn the Lock Lever [1], and remove the Waste Toner Container [2].
[1]
[2]
2) Open the Right Door Unit [1], release the Drum Cartridge Lock Lever [2], and then remove
the Drum Cartridge [3].
CAUTION:
Be sure not to touch the drum [1] of the Drum Cartridge.
[1]
F-9-10
F-9-9
CAUTION:
Be sure to block light to the removed Drum Cartridge using paper [1].
[1]
F-9-11
[1]
[2]
[3]
F-9-12
Содержание 1730
Страница 12: ...Update Firmware XXV Volume Control XXV Backup Data XXVI ...
Страница 17: ...1 1 Product Overview Product Overview Product Lineup Features Specifications Parts Name ...
Страница 211: ...5 5 Adjustment Adjustment Overview Adjustment when Replacing the Parts Image Position Adjustment ...
Страница 235: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code ...
Страница 250: ...8 8 Service Mode Service Mode Outline Details of Service Mode ...
Страница 333: ... Service Tools General Timing Chart General Circuit Diagram List of User Mode Appendix ...