![Cannon TE-BBR Скачать руководство пользователя страница 86](http://html1.mh-extra.com/html/cannon/te-bbr/te-bbr_instruction-and-operation-manual_493056086.webp)
75
TE-BBR Instruction and Operation Manual
Appendix 2 – Technical Note 0306131
BBR Motor Stirrer Installation
This technical note describes the procedure for installing the replacement motor stirrer (p/n 44.0610)
for the Thermoelectric Bending Beam Rheometer.
Caution:
This procedure requires access to the instrument’s internal
components. Follow all instructions carefully. Use appropriate procedures to
prevent damage to ESD-sensitive components. Prior to beginning procedure,
remove power from the TE-BBR unit heat exchanger supply.
Tools Required:
Philips #2 screwdriver, two open-end wrenches (1/2” and 9/16”), stubby #2 Phillips,
large common screwdriver, TE-BBR Motor Stirrer (p/n 44.0610)
Figure 32: TE-BBR Motor Stirrer/Plate and AC Power Connector
Install Procedure
1.
Drain the TE-BBR bath and remove the Load Frame, bath cover, stirrer and stirrer grid from the
instrument.
2.
Carefully turn the TE-BBR unit upside down to access the bottom panel.
Содержание TE-BBR
Страница 1: ...Instruction Operation Manual 44 0991 Thermo Electric Bending Beam Rheometer TE BBR ...
Страница 2: ......
Страница 10: ......
Страница 11: ......
Страница 44: ...CANNON Instrument Company Software Menu Options 33 Figure 17 Toolbar Options ...
Страница 47: ...36 TE BBR Instruction and Operation Manual Figure 18 Mold Specimen Diagram ...
Страница 70: ...CANNON Instrument Company Troubleshooting 59 Figure 25 Diagram A new Figure 26 Diagram B old ...
Страница 85: ...74 TE BBR Instruction and Operation Manual Figure 31 Graph View ...