Set Bath Temperature (VISCPRO II)
1.
In the VISCPRO II Menu, select
Configure > [
instrument group
] > [
instrument
] > Tray Settings:
Temperature
.
2.
Adjust the
Temperature Units
,
Target Temperature
, and
Temperature Tolerance
as necessary.
3.
Click
Save
; wait for the system to save the changes, and then click
Close
.
4.
Wait for the bath to adjust to the new temperature.
Note:
Temperature calibration, vacuum and pressure adjustment, and
sensor training can easily be performed directly from the CAV 4.2
GUI. Refer to
Getting Started
for more information.
Calibrate Temperature (VISCPRO II)
Calibrate the temperature of the CAV 4.2 whenever the instrument is moved, a new bath temperature is
to be used, or the bath fluid is refilled. The instrument is calibrated by inserting a thermometer through
an access hole in the display hood, measuring the actual temperature of the bath fluid, and entering
that temperature into the CAV 4.2 software.
1.
If it is raised, lower the display hood and plumbing lid.
2.
Carefully insert a thermometer through the access hole in the display hood and into the bath until
the top of the thermometer is in the middle of the capillary portion of the viscometer tube. The
thermometer passes through the same hole in the top of the bath unit that was used to fill the unit
with fluid.
3.
Wait for the thermometer to adjust to the temperature of the bath fluid. Read the reference
temperature.
4.
In the VISCPRO II Menu, select
Service > [
instrument group
] > [
instrument
] > Temperature
Calibration
. The Temperature Calibration window opens.
5.
Enter the reference temperature measured in step 3 in the
Reference Temperature
field.
6.
Click
Calibrate
; wait for the system to save the adjustment, and then click
Done
to close the
window.
7.
Remove and clean the thermometer.
8.
Repeat steps 2 through 7 for the second bath if necessary.
Set Vacuum and Pressure (VISCPRO II)
Set the vacuum and pressure of the CAV 4.2 before running the instrument.
1.
In the VISCPRO II Menu, select
Service > [
instrument group
] > [
instrument
] > Adjust
Vacuum/Pressure
.
2.
Follow the instructions on the screen to set the vacuum, then the pressure for each bath.