3.3 Installation Equipment, Tools and Supplies 

  Lifting sling or appropriately sized platform – for lifting cells into modules or modules into position. 

  Fork lift or portable crane. 

  Insulated steel toed safety shoes & remove all metals, i.e. rings, etc – to ensure no short circuits. 

   Bicarbonate of soda, 1 lb per gallon of water – to neutralize and clean up any electrolyte. 

   Metric insulated tools – to ensure no short circuits between connections. 

   Insulated torque wrench – to ensure no short circuits between connections. 

   Digital voltmeter with three – digits and 0.25% accuracy minimum – to record initial cell open circuit  

      voltages & ensure correct assembly. 

   Digital Micro-Ohm meter (DLRO) – to measure connection resistances. 

   Optional, one of the following; resistance, conductance or impedance meter – to record initial  

      ohmic measurements. 

   Non-metallic brush or pad for cleaning connections – to ensure clean connections for good integrity. 

   NO-OX-ID grease and applicator brush – to ensure good connection integrity throughout service life.

 

   Minimum of (2) lifting straps (lifting capacity 500 lbs + each). 

 

Part 4 - Receiving 

4.1 Inspection at Time of Delivery 

Great care has been taken to pack the battery for shipment to ensure its safe arrival. As soon as you 
receive the battery, check the packing material for evidence of damage in transit. If the packing material is 
physically damaged or wet acid stains are present, make a notation on the delivery receipt 

before you accept 

the shipment/delivery. 

NOTE: 

Freight Carriers generally require that the carriers’ 

representative inspect concealed damage within 10 days 

from date of delivery to determine responsibility. 

The resolution of such claims may extend up to nine months. 

Verify the number of cartons and skids against the bill of lading and verify their contents against the 
packing lists. Keep a copy of the verified lists for your installation records. It is important to confirm that 
the accessory package is present and the quantities are correct. If help is required, call C&D customer 
service department to report any discrepancies. 

4.2 Damage and Shortage Situations 

C&D ships FOB Pharr, TX (zip code 78577) (title/ownership passes to the ship-to/end user at the Pharr, TX 
warehouse). If shipments are damaged or if cartons or skids are damaged or missing, a claim must be filed 
with the carrier. Place an immediate order for replacement with C&D. Pay both the original invoice and the 
replacement invoice using the replacement cost as the amount of freight damages or shortages involved as part 
of your claim. If individual component items are missing, a shortage report should be filed within  
30-days from the date of receiving a shipment with C&D customer service department. Mail (express mail 
recommended), e-mail 

[email protected]

, call 1-800-543-8630 or fax a copy of the VERIFIED 

component-packing list. This verified list should show both the name of the packer, as well as the quantities 
of items checked off by the receiver.

  

 

 

Содержание Liberty DCS

Страница 1: ...RS02109 0814 CD 1 www cdtechno com MSE DCS...

Страница 2: ...is the responsibility of the customer to provide adequate ventilation so hydrogen gas accumulation in the battery area does not exceed two percent by volume However normal air circulation in a ventila...

Страница 3: ...s and Supplies 8 Part 4 Receiving 8 4 1 Inspection at Time of Delivery 8 4 2 Damage and Shortage Situations 8 Part 5 Storage 9 5 1 Storage Conditions 9 5 2 Storage Temperature and Duration 9 Part 6 In...

Страница 4: ...es 19 Part 9 Maintenance 20 9 1 Monthly Inspection 20 9 2 Quarterly 20 9 3 Semi Annually 20 9 5 Performance Tests 21 Part 10 Battery Degradation 21 10 1 General Information and Precautions 21 10 2 Flo...

Страница 5: ...essible from the front of the system assembly These cells are not designed for operation in any other orientation The Liberty MSE series is designed for float operation with minimal cycling Typical ap...

Страница 6: ...vices and First Aid 29CFR1 910 268 g Telecommunications 29CFR1910 305 j Wiring Methods Components and Equipment STD 1 8 2 e OSHA Standing Directive The following references to IEEE documents contain r...

Страница 7: ...jar or cover Failure to follow this warning may result in damage to the container and will void the warranty As a notice to all technicians and personnel in the near proximity of the batteries a BCI w...

Страница 8: ...acid stains are present make a notation on the delivery receipt before you accept the shipment delivery NOTE Freight Carriers generally require that the carriers representative inspect concealed damag...

Страница 9: ...battery and can cause potentially hazardous leakage Higher than normal storage temperature 77 F 25 C nominal will accelerate internal self discharge of a cell by a factor of two for each 15 F 10 C ov...

Страница 10: ...ction equipment 2 Allow a minimum of 4 00 between systems side to side where no side termination is being used Reference supplied C D connection diagram for additional details 3 Allow a minimum of 6 0...

Страница 11: ...ngs for reference which is supplied with every shipment The Liberty 2V floor mounting base has provisions for floor anchoring Consult the applicable building codes and regulations for specific require...

Страница 12: ...of the battery and follow the electrical circuit with succeeding numbers on the cell covers 6 8 Interconnection Cell series connection is made from the of one cell to the of the next sequential cell...

Страница 13: ...or corroded connections When checking connections disconnect the battery from the load and the charging equipment and follow all the precautionary measures outlined above and in the general safety ref...

Страница 14: ...charger The recommended method of providing an initial freshening charge section 5 2 and section 7 1 7 2 is to first determine the maximum allowable voltage that may be applied by the connected equipm...

Страница 15: ...t at Table 1 average cell voltage multiplied by the number of cells in the battery string Individual cell float voltages may vary by 0 10 0 05 volts from the average in a single string b Average strin...

Страница 16: ...an If you observe any unusual readings or visual indications consult your C D Technologies Representative and send a copy of your latest maintenance report to your local C D Representative or the tech...

Страница 17: ...system cannot achieve a full charge between discharging cycles or if the system is being utilized in a PSoC operation then additional charging needs to be employed to bring it back to full charge at...

Страница 18: ...ending on how the system is designed the batteries are regularly discharged and regularly re charged In these applications the charging system should be sized so that on the average the battery is ret...

Страница 19: ...the float voltage must be adjusted by 2mV per F or 3 6mV per C Adjust as indicated below Add 2mV 0 002 volts per F or 3 6mV per C below 77 F 25 C Subtract 2mV 0 002 volts per F or 3 6mV per C above 77...

Страница 20: ...er than 50 require further attention such as a load test 5 Measure and record the temperature of the negative terminal on each cell 9 3 Semi Annually including the above 6 Measure and record the indiv...

Страница 21: ...to the load or by way of interfacing electronics such as an uninterruptible power supply UPS system The name stationary implies the battery is usually permanently placed in a given location and not tr...

Страница 22: ...to the observer the plates will become sulfated If you suspect sulfated plates contact the C D Technical Services Department 1 800 543 8630 or 1 215 619 2700 for assistance Sulfated batteries are not...

Страница 23: ...leling valve regulated batteries is necessary the external circuit resistance should be matched for each battery A wide variation in battery circuit resistance can result in unbalanced discharge i e e...

Страница 24: ...protective honeycomb hood cardboard packaging and shrink wrap See Figure A1 Carefully remove all shipping materials and dispose of properly Once all shipping materials are removed unbolt the system f...

Страница 25: ...e base assembly into position and mark the anchor locations using the base as a template See Figure A6 A7 2 Six 13 16 20 6mm holes are provided in the system base for floor anchoring 3 Install floor a...

Страница 26: ...while lifting however once released and in position will return to square See Figure A9 2 Battery Lift Table Again prior to hoisting install only the 4 10mm bolts in the rear flanges Verify module or...

Страница 27: ...ure proper cell orientation Doing so can save time and effort in the future if a module is installed in the incorrect orientation 2 Once the module is in position and bolt holes are in alignment make...

Страница 28: ...the C D layout drawing attach the restraint bar using 4 10mm bolt assemblies See Figure A15 Top Restraint Each system stack will be supplied with one top restraint The top restraint will be installed...

Страница 29: ...ing base 4 Be sure the floor mounting base or assembly is in position and level and then torque the floor anchors If the base is not level use shims to level A level base is particularly important for...

Страница 30: ...with one gallon of water wipe the cover and terminal seal area with a cloth moistened with the neutralizing solution Do not allow the neutralizing solution to enter the cell Rinse with clear water an...

Страница 31: ...www cdtechno com Appendix C MSDS Documentation For the most up to date MSDS information please visit the C D Technologies public website Public Website www cdtechno com MSDS Sheets http cdtechno com...

Страница 32: ...RE05259 This tool shown in Figure D2 is available from your local C D Technologies Representative or directly through C D Customer Service customersvc cdtechno com 8 Prepare for cell removal by movin...

Страница 33: ...er C D Ship Date Positive Posts Date Installed Battery Model Negative Posts Cells X Strings Application Cell Covers Bus Voltage Portable Meter Bus Voltage Equipment Final Presence of Lubricant on cell...

Страница 34: ...TATUS Open Circuit Float Equalize BATTERY BUS VOLTAGE Vdc Vdc Vdc LOCATION Cell Volts 2 000 Serial Connection Resistance Internal Cell Conductance Impedance Resistance Cell Volts 2 000 Serial Connecti...

Страница 35: ...ppendix F Recycling Lead acid batteries are recyclable and C D Technologies currently has a low cost convenient and environmentally safe collection and recycling program Visit the C D Web site at www...

Страница 36: ...RS02109 0814 CD 36 www cdtechno com...

Страница 37: ...RS02109 0814 CD 37 www cdtechno com...

Страница 38: ...xpress or implied with regard to the accuracy or completeness of such information Further because the product s featured herein may be used under conditions beyond its control C D Technologies Inc her...

Отзывы: