GSQ-D SERIES
GSQ-D EC SERIES
DIRECT DRIVE GALVANIZED SQUARE INLINE BLOWER
OPERATION
INSTRUCTIONS
AND
PARTS
MANUAL
PLEASE READ AND SAVE THESE INSTRUCTIONS
M_GSQ_D_06_16_2022
Page 1 of 5
GENERAL SAFETY
GSQ-D SERIES MODELS: GSQ105-D, GSQ120-D, GSQ135-D, GSQ150-D, GSQ165-D, GSQ180-D
1.
All electrical work must be done in accordance with all applicable electrical codes by a qualified electrician.
2.
Prior to wiring ensure the power supply is locked in the
OFF
position and that the motor nameplate voltage matches the supply
voltage.
3.
Do not install or operate this fan in an environment where combustible materials, gases or fumes are present.
4.
Caution:
the fan contains rotating parts and electrical service. Appropriate safety precautions should be taken during installation,
operation and maintenance.
5.
Before starting the unit, ensure the wheel rotates freely.
6.
Check and tighten where necessary all nuts, bolts & set screws prior to fan start up (as some may have loosened during shipment).
7.
Please follow all applicable national, state/provincial and local codes, all of them will supersede this manual.
8.
Failure to follow the safety instructions in this manual may cause serious injury or death due to electrical shock or high
speed rotating parts.
The purpose of this manual is to aid in the proper installation and operation of the blowers. These instructions are intended to supplement
good general practices and are not intended to cover detailed instruction procedures.
IT IS THE RESPONSIBILITY OF THE PURCHASER TO ENSURE THAT THE INSTALLATION AND MAINTENANCE OF THIS
EQUIPMENT IS HANDLED BY QUALIFIED PERSONNEL.
Inspect all shipments carefully for damage. THE RECEIVER MUST NOTE ANY DAMAGE ON THE CARRIER’S BILL OF LADING
AND FILE A CLAIM IMMEDIATELY WITH THE FREIGHT COMPANY.