background image

4000 AVE. PINARD, 

ST-HYACINTHE, 

QUÉBEC, CANADA, 

J2S 8K4, 

TEL: 450-383-4000, 

FAX: 450-383-4004 

www.ventecventilation.com

 

Sept. 8, 2016 

       PAGE 15 OF 17 

REV 4 

8

 

START UP INFORMATION & DIAGRAMS  

8.1

 

START UP PROCEDURE  

 

Check that the power is turned off. 

 

Check VFD and Wiring Terminations for tight connections. 

 

Verify that the VFD is clean and dry. 

 

Test power wiring for short and open circuits. 

 

Ensure that suspension cable clamps or chain links are tight and closed. 

 

Ensure the fasteners of the wall or post supports are tight. 

 

Check that the cyclone and the circuit breaker or fuse clip is labelled. 

 

Ensure that the fan turns freely and is quiet. Check the belts too. 

 

Clear the area around and below the Cyclone. 

 

Energize the power circuit. 

 

Test the voltages at the drive and record them. Program the VFD per the VFD instruction manual. See 
programming notes below. 

 

Jog the fan motor on and off to ensure the proper rotation. The fan will turn clockwise looking 
underneath the fan

 

No

te: 

If

 the fan 

bl

ade 

turns

 

co

unter 

clockwise,

 

you

 

will

 need to 

de-energiz

e the fan 

an

wait

 

for

 the 

VFD to 

discharge.

 

T

hen 

reverse

 

tw

o of the 

motor

 

wiring

 phase 

terminal

le

ads. 

Jo

the

 

fa

n again 

to

 

ensure

 

th

proper

 

rotati

on. 

 

Start the fan and check the airflow. 

 

Setting the airflow.  The deflector vanes can be adjusted to direct the air stream. Allow 2-3 minutes for air 
flow stability before making more adjustments. 

 

Check the settings of drive according to the following tables; 

 

Check the operation of the VFD and fans with the GENSET ON. 

8.2

 

VFD PROGRAMMING NOTES 

By default, VFD should be programmed for the installation and ready to operate right off the box. . 

In case of trouble, refer to the VFD Instruction Manual before programming VFD or call 

Canarm

 Service 

department at 

1-800-260-5314

A 3HP, 85% efficiency, 3-phase, 1760RPM, totally enclosed, fan cooled, alternating current motor drives the 
cyclone fan. Verify the nameplate data of the motor and note this information to use in programming the VFD 
parameters. 

PUTTING INNOVATION TO WORK

7686 16 Line, Arthur, ON. 

N0G 1A0 

Email: [email protected] 

Tel: 1-800-263-5314 

Fax: 519-848-3948 

www.canarm.com

Содержание AgSystems CYCLONE PLUS

Страница 1: ...4 TEL 450 383 4000 FAX 450 383 4004 WWW VENTEC CA CYCLONE PLUS INSTALLATION MANUAL PUTTING INNOVATION TO WORK CYCLONE PLUS INSTALLATION MANUAL 7686 16 Line Arthur ON N0G 1A0 www canarm com Email agsal...

Страница 2: ......

Страница 3: ...CYCLONE IN PLACE 8 3 2 2 STEP 2 INSTALL CYCLONE DEFLECTORS 8 4 DIRECTIONS FOR HANGING MOUNTING THE CYCLONE 9 4 1 CEILING SUSPENDED 9 4 2 WALL OR COLUMN INSTALLATION 10 4 3 FLOOR STANDING MOUNT 11 5 AS...

Страница 4: ...and efficient recirculation fans available on the market today Its main benefits are It moves a large volume of air 86 000cfm It creates vertical wind for cooling at floor level It can run at low spee...

Страница 5: ...s as described in figure 2 The installation is by design made simple for skilled tradesmen If you are unsure about this please call our number for technical support 1 800 260 5314 We recommend you hir...

Страница 6: ...age weight is 450 lbs Weight 375 lbs without packaging and skid Skid sizes are roughly 3 8 W H 2 The deflectors mounting hardware and deflector mounting brackets are shipped with the fan and require a...

Страница 7: ...igh speed 60Hz for 245rpm Visit Canarm com to view our full offering of controls 460VAC drives are also available on demand and require the addition of line reactors You can also add one of our temper...

Страница 8: ...ood condition avoid storing the material in corridors where tractors or other vehicles can cause damage All the floor work should be done in a dedicated workspace to begin the installation The fans ha...

Страница 9: ...ion airflow See Fig 5 Figure 4 4 Cyclone Plus assembled for two o directions airflow Figure 5 Cyclone Plus assembled for one e direction airflow Sept 8 2016 PAGE 7 OF 17 REV 4 PUTTING INNOVATION TO WO...

Страница 10: ...he intake together ng M6x30mm Mech Screw at you have a space of inc x9 M6 ch between the Sept 8 2016 PAGE 8 OF 17 REV 4 Install the top of the fan housing at more than 4 feet to the ceiling roof deck...

Страница 11: ...ere are 4 eyelets installed on the fan These metric eyelets are M10 x 75 shanks with a 30 mm loops Standard Cable or chain shall be installed vertically to the ceiling at a 45 degrees angle away from...

Страница 12: ...columns or walls see figure 7 Canarm can provide the steel arm kit for existing 6 x8 or an 8 x8 post fixation part FGCY MNTKIT Hardware description is provided with the kit A tilted union for one way...

Страница 13: ...0 383 4000 FAX 450 383 4004 www ventecventilation com e 8 Heavy gauge steel base with concrete Figure 8 Cyclo one Plus install on post horizonta ally and at 30 degree angle Contact your Canarm rep for...

Страница 14: ...and 24 6mm x 18mm flat washers to mount the deflector brackets Install the turning vanes in between the brackets with the 24 M8 x 25mm bolts and 24 8mm x 25mm flat way rflow See Figures 9 and 10 Fing...

Страница 15: ...r Use power wire copper type 600V 105C USA or Canada REW XLPVC or TEW Size all conductors for 3 voltage drop Run a circuit exclusively for the drive Physically split input and output wiring of the dri...

Страница 16: ...opper f and 6 3 AUTOMATIC CONTROL SYSTEM Specific directions will be provided for the Automatic Control System Options 7 WARRANTY CANARM Ltd warrants every new fan to be free of defects in material an...

Страница 17: ...e fan Note If the fan blade turns counter clockwise you will need to de energize the fan and wait for the VFD to discharge Then reverse two of the motor wiring phase terminals leads Jog the fan again...

Страница 18: ...procedure must be done each year Requiered material Grease gun Lithium grease Figure 1 Grease gun STEP 1 Locate the grease fitting on the end of the propeller shaft in front of you STEP 2 Insert grea...

Страница 19: ..._______________________________________ __________________________________________________________________ __________________________________________________________________ __________________________...

Отзывы: