30
Use for Lead Lag Master
demands
P
Boiler
Pump
Pump Control
Auto
Refer to above (Default)
ON
Refer to above
Pump Output
Pump A
Specify pump contact
Over run time
1..5 min
Post pump time (Default: 1 min)
Use for local (Stand-
alone) demands
P
Use for Lead Lag Master
demands
P
Pump
Configuration
DHW
Pump
Pump Control
Auto
Refer to above (Default)
ON
ON: Pump is constantly powered
Pump Output
Pump B
Specify pump contact
Over run time
1..5 min
Post pump time (Default: 1 min)
6.1.3 Statistics Configuration
Menu Group
Selection
Sub-Menu
Group
Selection
Parameter
Selection
Description
Statistics
Configuration
Boiler pump cycles
Displays the number of cycles the boiler pump has been activated
Burner cycles
Displays the number of cycles the burner has been activated
Burner run time
Displays burner run time in hours
CH pump cycles
Displays the number of cycles the CH pump has been activated
DHW pump cycles
Displays the number of cycles the DHW pump has been activated
6.1.4 Burner Control Timing and Rates
Figure 36: Burner Control Timing and Rates
Menu Group Selection
Sub-Menu Group
Selection
Parameter
Selection
Description
Burner Control Timing and
Rates
Prepurge rate
3000 RPM
Prepurge fan speed
Prepurge time
25 sec..5 mins
Prepurge time (Default: 25 sec)
Run Stabilization Time
10 sec
Main flame establishing period
Postpurge rate
3000 RPM
Postpurge fan speed
Postpurge time
25 sec..5 mins
Postpurge time (Default 25 sec)
6.1.5 Sensor Configuration
Menu Group
Selection
Sub-Menu
Group
Selection
Parameter
Selection
Description
Sensor
Configuration
S1 (J8-4, 5) sensor
10K NTC single non-safety
Inlet Sensor
S2 (J8-6, 7) sensor
4-20mA
4-20mA Input Signal
S3S4 (J8-8, 9) sensor
10K NTC dual safety
Outlet Sensor
S5 (J8-11, 12) sensor
10K NTC single non-safety
Outdoor Sensor: Standalone boiler or Slave boiler
Header sensor: Master boiler
S6S7 (J9-1, 2) sensor
10K NTC single non-safety
DHW Sensor (ARW Only)
S8S9 (J9-4, 5) sensor
10K NTC single non-safety
Stack Sensor
Содержание Valiant-FT II Series
Страница 2: ...99 0419 Rev 00...
Страница 40: ...36 PART 9 PIPING DIAGRAMS Figure 40 Single Boiler Hydronic Heating Zoned Piping...
Страница 41: ...37 Figure 41 Multiple Boiler Hydronic Heating Zoned Piping...
Страница 42: ...38 Figure 42 Single Boiler with DHW Tank Hydronic Heating Zoned Piping...
Страница 43: ...39 PART 10 PARTS LIST...
Страница 44: ...40...
Страница 45: ...41...
Страница 46: ...42...
Страница 47: ...43...
Страница 48: ...44...
Страница 49: ...45...
Страница 50: ...46...
Страница 51: ...47...
Страница 52: ...48...
Страница 53: ...49...
Страница 54: ...50...
Страница 60: ...56 PART 11 TUBING DIAGRAM...
Страница 61: ...57 PART 12 WIRING DIAGRAM...
Страница 62: ...58...
Страница 63: ...59...