FIGURE 7-5. Template assembly
4. Assemble the template frame as shown in
(p. 12). Align the template frame with
the notches in the template as shown in
(p. 15) and secure the template to the
template frame with 25 mm (1 in) screws. Orient the template so one side of the tower faces
the equator. Set the template frame on top of the concrete form and position it so the
distance from the inside edge of the form to the three anchor bolts matches the
dimensions given in
(p. 15). This placement optimizes the position of the
anchor bolts inside the concrete. Anchor the template frame to the concrete form with 65
mm (2 1/2 in) screws.
UT20 and UT30 Universal Towers
14
Содержание UT20
Страница 1: ...Revision 03 2020 Copyright 1993 2020 Campbell Scientific Inc...
Страница 10: ...FIGURE 5 1 UT20 tower UT20 and UT30 Universal Towers 7...
Страница 38: ...FIGURE 7 28 Bracket selection UT20 and UT30 Universal Towers 35...
Страница 41: ...A B 14 7 Page 1 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 42: ...C 43 2 cm 17 in A UTBASE Page 2 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 43: ...C B UTBASE Page 3 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...