
iii
Figures
1. CS110 Electric Field Meter ........................................................................ 1
2. Charge Amplifier Circuitry of Reciprocating Electric Field Meter ............ 6
3. Charge Amplifier Output During an Electric Field Measurement Cycle ... 7
4. CS110 Average Current Consumption versus measurement Interval ........ 9
5. Parallel-Plate Electric Field Meter Calibration Chamber ......................... 11
6. Factory Calibration Data for CS110 SN: 1026 ......................................... 12
7. NIST Calibration Certificate ..................................................................... 13
8. CS110 2 Metre CM10 Tripod Site ............................................................ 14
9. Campbell Scientific, Ltd. Electric Field Meter Site Correction Facility ... 15
10. CS110 Attached to Upward-Facing Flush-Mounted Plate for Site
Correction .............................................................................................. 15
11. Site Correction Data for CS110 2 Metre CM10 Tripod Site .................. 16
12. Electric Field Measured with CS110 During Local Thunderstorm ........ 18
13. CS110 Stator, Shutter and Sense Electrode ............................................ 32
14. Inside of CS110 Case Illustrating Bracket for Holding Desiccant ......... 34
D-1. Exploded View of CS110 Electric Field Meter ................................. D-1
D-2. CS110 Motor Assembly .................................................................... D-4
E.1. CS110 slow antenna frequency response ............................................ E-2
E.2. KSC electric field and CS110 slow antenna data ................................ E-3
E.3. KSC electric field change and CS110 slow antenna data .................... E-4
G-1. CS110 2 Metre CM10 Tripod Site .................................................... G-1
G-2. CS110 on CM10 Tripod Mast ........................................................... G-3
G-3. Earth Grounding ................................................................................ G-4
G-4. Determination of Csite ...................................................................... G-5
H-1. Tripod CS110 and StrikeGuard ......................................................... H-1
H-2. CS110 and StrikeGuard on Tripod Mast ........................................... H-2
H-3. Grounding the CS110 Grounding Strap ............................................ H-3
H-4. Grounding the Tripod and Battery .................................................... H-4
H-5. Connections for Combined System ................................................... H-5
H-6. Determination of Csite ...................................................................... H-6
Содержание CS110
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ...iv This is a blank page ...
Страница 37: ...Instruction Manual 27 ...
Страница 48: ......
Страница 52: ...Appendix B CS110 Accessories This is a blank page B 2 ...
Страница 56: ...Appendix C CS110 Connector Pin outs C 4 This is a blank page ...
Страница 72: ...Appendix F Example CRBasic Programs This is a blank page F 4 ...
Страница 78: ...Appendix G CS110 2 Metre CM10 Tripod Site This is a blank page G 6 ...
Страница 85: ......