15
MAINTENANCE SCHEDULE
MAINTENANCE SCHEDULE
For optimum performance and maximum durability, please refer
to the following maintenance grid:
Do not use a brake cleaning solvent to clean the track system.
This may damage sealing components and stickers.
WARNING
Do not insert hands or feet into or near the System unless
the engine is off, and the vehicle is stopped with the secu-
rity brake engaged.
Elements to check and main-
tain
Frequency
Break-in
period
After
break-in
Rubber track tension
1 hour,
4 hours
20 hours
Bolt torque
1 hour
4 hours
Anti-pivot adjustment
4 hours
20 hours
Alignment (wheel alignment)
N/A
20 hours
Condition of bearings and seal
ring wear sleeves (main pivot)
N/A
Once a
year
Visual inspection
Before
riding
Before
riding
WARNING
After extreme environment uses (mud and water) and
inspecting all bearings once a year, please note that bear-
ings cannot be regreased like snowmobile bearings. If they
need to be serviced replace the wheel completely. Some of
the components (i.e. 5-in (132-mm) wheels) need special
tool for servicing. Please use appropriate tools to avoid any
damage to your component.
Содержание Tatou
Страница 1: ...User Manual TATOU UTV Track System ...