17
MC-III™ Panel Mount Flow Analyzer
Section 2
Field Wiring Connections
All field wiring connects to the circuit assembly mounted on the back side of the switchplate.
Wiring Procedure
To wire the MC-III Panel Mount for operation, complete the following field connections:
1. Connect the lithium battery connector to the J1 receptacle on the circuit assembly.
2.
Connect wiring for external power, if appropriate. See
.
3.
Connect the flow meter or pulse input wiring to terminal block TB1. See
4.
Connect wiring for the remote reset input to terminal block TB1, if appropriate. See
5.
Connect wiring for output signals, if appropriate. See
Figure 2.7, page 21, through Figure 2.12, page
6.
Recalibrate the MC-III Panel Mount (if necessary).
7. If external and internal power supplies were removed, reset the clock to ensure that the time stamps in the
log data are accurate. The clock is reset using the MC-III interface software. See
Содержание NUFLO MC-III
Страница 1: ...NUFLO TM MC III Panel Mount Flow Analyzer User Manual Manual No 2350326 01 Rev 02 ...
Страница 36: ...36 Section 3 MC III Panel Mount Flow Analyzer ...
Страница 66: ...66 Section 4 MC III Panel Mount Flow Analyzer Figure 4 30 4 20 mA output test screen ...
Страница 86: ...86 Section 5 MC III Panel Mount Flow Analyzer ...
Страница 100: ...B 2 Appendix B MC III Panel Mount Flow Analyzer ...
Страница 118: ...C 18 Appendix C MC III Panel Mount Flow Analyzer ...
Страница 119: ...C 19 MC III Panel Mount Flow Analyzer Appendix C ...
Страница 120: ...R U S S I A 603 5569 0501 ms kl c a m com ...