CAME F1000 Скачать руководство пользователя страница 1

            

FERNI

 

SERIES

INSTALLATION MANUAL

 

F1000 - F1100

AUTOMATION 

FOR SWING GATES

 English

EN

1 1 9 D 6 9 E N

Содержание F1000

Страница 1: ...FERNI SERIES INSTALLATION MANUAL F1000 F1100 AUTOMATION FOR SWING GATES English EN 119D69EN...

Страница 2: ...laced where the moving gate leaves transit areas and driveways are completely visible If missing ap ply a permanent label that shows the position of the release mechanism Before delivering to the clie...

Страница 3: ......

Страница 4: ...dards 4 2 Technical features Gate leaf width m Gate leaf weight kg 2 00 800 2 50 600 3 00 500 3 50 450 4 00 400 Whenever the shutter is over 2 5 m it needs an electrical lock F1000 F1100 always needs...

Страница 5: ...tance B is 300 to 380 mm distance A must be at least 150 mm Before installing do the following Make sure the structure of the gate is sturdy the hinges work and that the is no friction between moving...

Страница 6: ...230 V control panel power supply FROR CEI 20 22 CEI EN 50267 2 1 3G x 1 5 mm2 3G x 1 5 mm2 3G x 2 5 mm2 230 V motor power supply 3G x 1 5 mm2 3G x 1 5 mm2 3G x 2 5 mm2 Flashing light 2 x 1 5 mm2 2 x...

Страница 7: ...ici s p a to notify users ENGLISH Front view 150 mm Insert the gearmotor into the base plate and secure it using the two supplied M8x110 screws and M8 nuts Secure the base plate to the pillar using 8...

Страница 8: ...automatici s p a to notify users ENGLISH Insert the straight semi arm into the motor shaft Apply the flared washer the M6x20 screw and lock the semi arm using the two grub screws Join and secure the t...

Страница 9: ...tivated and screw the microswitch is activated and screw the screw in the related cam During closure F 1000 only release the door and move it to the desired closing position Turn the lower cam until t...

Страница 10: ...device out the reach of children to prevent operator from being activated by accident In the event of anomalous behaviour stop using the operator immediately Danger of crushing hands Danger of cru sh...

Страница 11: ...d Before performing any maintenance procedures cut off the main power to prevent possible accidents due to gate movement To clean the photocells use a water dampened cloth Do not use solvents or other...

Страница 12: ...___ __________________________________________________________________________________________________ _________________________________________________________________________________________________...

Страница 13: ...the following Standards DIRECTIVES 98 37 CE 98 79 CE MACHINERY DIRECTIVE 98 336 CEE 92 31 CEE ELECTROMAGNETIC COMPATIBILITY DIRECTIVE 73 23 CEE 93 68 CE LOW VOLTAGE DIRECTIVE 89 106 CEE CONSTRUCTION P...

Страница 14: ...510 CAME Americas Automation Llc U S A 11345 NW 122nd St Medley FL 33178 1 305 433 3307 1 305 396 3331 ASIA CAME Asia Pacific 60 Alexandra Terrace 09 09 Block C The ComTech 118 502 Singapore 65 6275 0...

Отзывы: