background image

Chapter 9:  Acceptance & Commissioning Procedures 

Configuration 

 

phn-3967_005v000 

Page 9-3 

Chapter 9: 

 

Acceptance & Commissioning 

Procedures 

This chapter provides 

Cambium Networks’

 recommended Acceptance and Commissioning 

Procedure for PTP 820. Acceptance and commissioning should be performed after initial setup is 
complete. 
The purpose of this procedure is to verify correct installation and operation of the installed link and 
the interoperability with customer end equipment. 

Cambium Networks’

 Acceptance and Commissioning procedure includes the following stages: 

 

Site Acceptance Procedure 

 

Commissioning of radio link  

The Site Acceptance Procedure is a checklist that summarizes the installation requirements of the 
site at which the products were installed. 

The commissioning tests cover the required configuration information that should be recorded, 
and the tests that should be performed on the radio link. 

 

 

Содержание PTP 820G

Страница 1: ...INSTALLATION GUIDE PTP 820G and PTP 820G Assured System Release 10 0...

Страница 2: ...aterial Accordingly any copyrighted material of Cambium its licensors or the 3rd Party software supplied material contained in the Cambium products described in this document may not be copied reprodu...

Страница 3: ...Equipment Precautions 1 2 Safety Precautions Declared Material 1 4 Pr cautions g n rales relatives l quipement 1 4 Allgemeine Vorsichtsma nahmen f r die Anlage 1 4 Chapter 2 PTP 820G Hardware Descrip...

Страница 4: ...onnecting Power Cable 5 1 Power Supply Notes 5 3 Chapter 6 Cabling Requirements for Unit Redundancy 6 1 Cabling for Ethernet Interfaces 6 2 Cabling for E1 DS1 Interfaces 6 3 Cabling for T3 Synchroniza...

Страница 5: ...rface 7 7 Figure 15 Management Interface 7 8 Figure 16 Change User Password Page 7 10 Tables Table 1 GbE Interface Pin Out Diagram GbE1 GbE2 GbE3 GbE4 2 3 Table 2 PTP820 Ethernet split cable for Manag...

Страница 6: ...edundancy Chapter 7 Performing Initial Configuration Chapter 8 Specifications Chapter 9 Acceptance Commissioning Procedures Contacting Cambium Networks Support website https support cambiumnetworks co...

Страница 7: ...e of the customer or anyone acting on the customer s behalf to abide by the instructions system parameters or recommendations made in this document Cross references References to external publications...

Страница 8: ...tandard hardware warranty is for one 1 year from date of shipment from Cambium Networks or a Cambium distributor Cambium Networks warrants that hardware will conform to the relevant published specific...

Страница 9: ...ed security practices Security aspects to be considered are protecting the confidentiality integrity and availability of information and assets Assets include the ability to communicate information ab...

Страница 10: ...e following format Warning Warning text and consequence for not following the instructions in the warning Cautions Cautions precede instructions and are used when there is a possibility of damage to s...

Страница 11: ...nt in EU countries Disposal of Cambium equipment European Union EU Directive 2002 96 EC Waste Electrical and Electronic Equipment WEEE Do not dispose of Cambium equipment in landfill sites For disposa...

Страница 12: ...small footprint high density and a high degree of availability PTP 820G is an integral part of the PTP family of high capacity wireless backhaul products Together the PTP family of products provides a...

Страница 13: ...equipment Caution Where special cables shields adapters and grounding kits are supplied or described in this manual these items must be used to comply with the FCC regulations Caution Use of controls...

Страница 14: ...isolation below a certain frequency range galvanic isolator see EN 60728 11 Utstyr som er koplet til beskyttelsesjord via nettplugg og eller via annet jordtilkoplet utstyr og er tilkoplet et kabel TV...

Страница 15: ...t d brancher toutes les alimentations lectriques Caution Bruit de machine d ordre 3 GPSGV le plus haut niveau de pression sonore s l ve 70 dB A au maximum dans le respect de la norme ISO EN 7779 Allge...

Страница 16: ...IDU contains six Ethernet interfaces one or two radio interfaces depending on the hardware configuration and optionally a 16 x E1 DS1 interface The IDU also includes two FE management interfaces a DB9...

Страница 17: ...f The interface is shut down or the signal is lost o Green The interface is enabled and the link is operational o Blinking Green The interface is transmitting and or receiving traffic Port Rate LED Lo...

Страница 18: ...al pair A 2 BI_DA Bi directional pair A 3 BI_DB Bi directional pair B 4 BI_DC Bi directional pair C 5 BI_DC Bi directional pair C 6 BI_DB Bi directional pair B 7 BI_DD Bi directional pair D 8 BI_DD Bi...

Страница 19: ...interface To access both management interfaces a special Ethernet split cable for Management can be ordered from Cambium Networks Table 2 PTP820 Ethernet split cable for Management Cambium Part No Mar...

Страница 20: ...reen The interface is transmitting and or receiving management traffic Figure 5 Management FE Interface LEDs Management Interface Pin Outs Table 3 Management Interface Pin Out Diagram MGMT RJ45 Pin no...

Страница 21: ...erly Green or if there is an error or a problem with the card s functionality Red E1 DS1 LED Indicates whether the interfaces are enabled with no alarms Green with alarms Red or no interfaces enabled...

Страница 22: ...2 OUT RING8 9 OUT TIP9 Ch9 Tx TWISTED PAIR 43 OUT RING9 10 OUT TIP10 Ch10 Tx TWISTED PAIR 44 OUT RING10 11 OUT TIP11 Ch11 Tx TWISTED PAIR 45 OUT RING11 12 OUT TIP12 Ch12 Tx TWISTED PAIR 46 OUT RING12...

Страница 23: ...25 IN TIP7 Ch7 Rx TWISTED PAIR 59 IN RING7 26 IN TIP8 Ch8 Rx TWISTED PAIR 60 IN RING8 27 IN TIP9 Ch9 Rx TWISTED PAIR 61 IN RING9 28 IN TIP10 Ch10 Rx TWISTED PAIR 62 IN RING10 29 IN TIP11 Ch11 Rx TWIS...

Страница 24: ...Chapter 2 PTP 820G Hardware Description TDM Interfaces E1 DS1 1x16 Optional phn 3967_005v000 Page 2 9 Pin Signal Label on the Twisted Pair Type 51 SHELL SHIELD 52 SHELL SHIELD...

Страница 25: ...king properly Green or if there is an error or a problem with the interface s functionality Red as follows o Off The radio is disabled o Green The radio is active and operating normally o Blinking Gre...

Страница 26: ...Chapter 2 PTP 820G Hardware Description Radio Interfaces phn 3967_005v000 Page 2 11 Figure 7 Radio Interface LEDs...

Страница 27: ...are mixed up the system remains shutdown The allowed power input range for the PTP 820G is 40V to 60V An under voltage alarm is triggered if the power goes below the allowed range and an over voltage...

Страница 28: ...ollows T3 Status LED Located on the upper left of the interface Indicates the status of T3 input clock as follows o Off There is no T3 input clock or the input is illegal o Green There is legal T3 inp...

Страница 29: ...Chapter 2 PTP 820G Hardware Description Synchronization Interface phn 3967_005v000 Page 2 14 RJ45 Pin no Description 3 1PPS_P 4 T4_OUT_N 5 T4_OUT_P 6 1PPS_N 7 ToD_P or PPS_IN_P 8 ToD_N or PPS_IN_N...

Страница 30: ...ludes an RJ 45 terminal interface RS 232 A local craft terminal can be connected to the terminal interface for local CLI management of the unit Terminal Interface Pin Outs Table 6 Terminal Interface P...

Страница 31: ...ms are configurable according to 1 Intermediate 2 Critical 3 Major 4 Minor 5 Warning The output alarm is configured according to predefined categories External Alarm Pin Outs Table 7 External Alarm In...

Страница 32: ...as follows Off Power is off Green Power is on and no alarms are present on the unit When the unit is part of a PTP 820G unit redundancy pair Green indicates that the unit is in Active mode Orange Powe...

Страница 33: ...IPS 140 2 Level 2 physical security AES 256 encryption FIPS 197 over radio links The PTP 820 Assured platform also provides Secured communication and protocols for management interface Centralized use...

Страница 34: ...phn 3967_005v000 Page 3 1 Chapter 3 Preparation for Installation This section provides instructions for transporting inspecting and unpacking the equipment for a PTP 820G system prior to installation...

Страница 35: ...forklift trucks and slings The cargo must be kept dry during transport and storage For sea transport deck side shipment is not permitted Carrier owned cargo containers must be used It is recommended...

Страница 36: ...age 3 3 Inspection Check the packing lists and ensure that correct parts numbers quantities of goods have arrived Inspect for any damage on the cases and equipment Report any damage or discrepancy to...

Страница 37: ...essential that whenever unpacking or disassembling the equipment and handling printed circuit boards special precautions must be taken to avoid ESD Electrostatic Static Discharge Generally units with...

Страница 38: ...on provides instructions for installing a PTP 820G IDU Figure 11 IDU Full Configuration Kits required to perform the installation Table 8 Required Kits for installation Description Quantity PTP 820G c...

Страница 39: ...rack as shown in the following figures Use four screws not supplied with the installation kit to fasten the IDU to the rack If you are installing multiple PTP 820G units in a single rack make sure to...

Страница 40: ...5v000 Page 4 3 Grounding the PTP 820G Connect a grounding wire first to the single point stud shown in the figure below and then to the rack using a single screw and two washers Verify that the ground...

Страница 41: ...wer supply grounding must be in according with the following figure Figure 12 Power Supply Grounding PTP 820G utilizes two power interface for power redundancy A power cable connector is included with...

Страница 42: ...e Site phn 3967_005v000 Page 5 2 4 Insert the wires into the connector 5 Secure the wires in the connector with the screws 6 Plug the connector into the PTP 820G power interface and tighten the two sc...

Страница 43: ...mergency power generator The power source must be grounded The unit has more than one supply connection Remove all power from the unit for servicing Warning Make sure to use a circuit breaker to prote...

Страница 44: ...phn 3967_005v000 Page 6 1 Chapter 6 Cabling Requirements for Unit Redundancy...

Страница 45: ...et Splitter Mode the following Y cable must be connected to the relevant interfaces on the active and standby units Table 9 Y Cable for Electrical Splitter Mode FE Traffic Interface Protection Part Nu...

Страница 46: ...f the E1 DS1 interfaces are being used a Y cable is used to connect the active and standby E1 DS1 interfaces The following table shows the Part Number and Marketing Model of the Y cable required for E...

Страница 47: ...ents for Unit Redundancy Cabling for T3 Synchronization phn 3967_005v000 Page 6 4 Cabling for T3 Synchronization If T3 synchronization input is being used a Y cable is used to connect to the active an...

Страница 48: ...ble for Protection and Management Part Number Description C000082L155A PTP820G Splitter cable for protection and management 1 34m CAT5E The protection and management splitter cable must be connected t...

Страница 49: ...Page 7 6 Chapter 7 Performing Initial Configuration This section describes how to establish a management connection with the PTP 820G unit and lists the configuration steps that must be performed in o...

Страница 50: ...P 820G front panel Figure 14 Terminal Interface 2 Configure the following settings for the COM port you are using on your PC or laptop Bits per Second 115 200 Data Bits 8 Parity None Stop Bits 1 Flow...

Страница 51: ...to e g 192 168 1 10 and subnet mask to 255 255 255 0 Note The initial settings before changing Note The chassis IP address as well as password must be changed before setting the system in operation F...

Страница 52: ...On phn 3967_005v000 Page 7 9 Logging On 1 Open a browser e g Internet Explorer Mozilla Firefox etc 2 Type in the default IP address 192 168 1 1 in the Address Bar Login Window 3 Enter the following v...

Страница 53: ...tivated the password must meet the following criteria Password length must be at least eight characters Password must include characters of at least three of the following character types lower case l...

Страница 54: ...ent on the other side of the hop may be lost By default all elements have the same IP settings IP address 192 168 1 1 Subnet mask 255 255 255 0 Note After the new IP address is set the contact with th...

Страница 55: ...nmental Specifications for RFU Operating ETSI EN 300 019 1 4 Class 4 1 Temperature o 33 C 27 F to 55 C 131 F Temperature range for continuous operating temperature with high reliability o 45 C 49 F to...

Страница 56: ...r and antenna size Power Consumption Specifications The following table shows the maximum power consumption for PTP 820G IDU and supported RFUs The maximum power consumption for the entire system is t...

Страница 57: ...o verify correct installation and operation of the installed link and the interoperability with customer end equipment Cambium Networks Acceptance and Commissioning procedure includes the following st...

Страница 58: ...t is of sufficient height to clear local obstructions OK Mount is safely positioned to not cause a safety hazard OK Mount is secure and perpendicular OK Mount is grounded as per site specifications OK...

Страница 59: ...washers as appropriate OK Flexible waveguide is secured to the pole OK 5 COAX CABLE Overall cable length Cable type N Type connectors assembled properly on the cable OK Cable connected securely to RF...

Страница 60: ...nds are properly labeled OK 7 INDOOR UNIT IDU is securely mounted to the rack OK IDU is located in a properly ventilated environment OK IDU fans are functional and air flow to the fans is not disrupte...

Страница 61: ...cedures Site Acceptance Procedure phn 3967_005v000 Page 9 7 SITE ACCEPTANCE CHECKLIST continued 10 REMARKS NOTES 11 GENERAL INFORMATION Site accepted by Name Title Company Signature Date Site approved...

Страница 62: ...g section above o Antenna sway braces are fitted and installed correctly where applicable Typically for an antenna of 1 2 m or larger an extra sway brace is fitted to the mounting frame of the antenna...

Страница 63: ...phn 3967_005v000 Page 9 9 Typical labeling requirements include Antenna labels for link identity and bearing RFU labels for link identity frequency and polarization Coax cable labels for link identity...

Страница 64: ...cal loop at remote end or connect second analyzer Run Packet Loss test for at least one hour load rate as per Cambium Networks specifications for the chosen MRMC Connect Ethernet Packet Analyzer to th...

Страница 65: ...ning Procedures Radio Link Commissioning Procedure phn 3967_005v000 Page 9 11 If the management station is located at a remote site Network Operation Center verify that the management station can mana...

Страница 66: ...missioning tests Maintaining the Commissioning Log is important for tracking your installations and to provide essential data for Cambium Networks Upon completing the Commissioning Log send the log to...

Страница 67: ...Link distance Rain zone Expected RSL dBm Expected Diversity RSL dBm RSL Main dBm RSL Diversity dBm Deviation from exp RSL 4 dB 5 COMMISSIONING TESTS Site 1 Site 2 Line loopback Pass Pass RFU loopback...

Страница 68: ...Chapter 9 Acceptance Commissioning Procedures PTP 820 Commissioning Log phn 3967_005v000 Page 9 14 Signature Commissioned by Name Company Date Signature...

Отзывы: