Chapter 5: Installation
Mount the ODU, LPU and surge suppressor
Page
16
10
Connect an Ethernet cable to the other Ethernet jack of the 600SSH and to the power adapter.
11
Replace the cover of the 600SSH.
General protection installation
To adequately protect a 450 Platform Family installation, both ground bonding and transient voltage
surge suppression are required.
Grounding cable requirements
When routing, fastening and connecting grounding cables, the following requirements must be
implemented:
•
Grounding conductors must be run as short, straight, and smoothly as possible, with the fewest
possible number of bends and curves.
•
Grounding cables must not be installed with drip loops.
•
All bends must have a minimum radius of 203 mm (8 in) and a minimum angle of 90° (
). A
diagonal run is preferable to a bend, even though it does not follow the contour or run parallel to
the supporting structure.
•
All bends, curves and connections must be routed towards the grounding electrode system, ground
rod, or ground bar.
•
Grounding conductors must be securely fastened.
•
Braided grounding conductors must not be used.
•
Approved bonding techniques must be used for the connection of dissimilar metals.
Figure 79 Grounding cable minimum bend radius and angle
Содержание PMP 450 AP
Страница 79: ...Chapter 2 System hardware System Components Page 2 29 Figure 20 Gigabit Enet Capable power supply...
Страница 160: ...Chapter 3 System planning Radio Frequency planning Page 3 30 Figure 55 Sector Antenna...
Страница 161: ...Chapter 3 System planning Radio Frequency planning Page 3 31 Figure 56 cnMedusa Antenna...
Страница 189: ...Chapter 3 System planning Remote AP Deployment Page 3 59 Figure 65 Remote AP wired to SM that serves as a relay...