EU Declaration of Conformity
Hereby, Cambium Networks declares that the Cambium 450 Series, 450i Series and 450m Series
Wireless Ethernet Bridge complies with the essential requirements and other relevant provisions of
Radio Equipment Directive 2014/53/EU. The declaration of conformity may be consulted at:
https://www.cambiumnetworks.com/eu_dofc
Specific expertise and training for professional installers
To ensure that the 450 Platform Family products – PMP/PTP 450 Series, PMP/PTP 450i Series, PMP
450m Series are installed and configured in compliance with the requirements of ISEDC and the FCC,
installers must have the radio engineering skills and training described in this section.
The Cambium Networks technical training program details can be accessed from below link:
https://www.cambiumnetworks.com/training/
Ethernet networking skills
The installer must have the ability to configure IP addressing on a PC and to set up and control products
using a web browser interface.
Lightning protection
To protect outdoor radio installations from the impact of lightning strikes, the installer must be familiar
with the normal procedures for site selection, bonding and grounding. Installation guidelines for the 450
Platform Family can be found in
Training
The installer needs to have basic competence in radio and IP network installation. The specific
requirements applicable to the 450 Platform should be gained by reading:
•
Chapter 4: Preparing for installation and Chapter 5: Installation of 450 Platform Planning and
Installation Guide (this document),
•
Chapter 1: Configuration, Chapter 2: :Tools, and Chapter 3: Operation of 450 Platform Configuration
Guide,
•
And by performing sample set ups at base workshop before live deployments.
The Cambium Networks technical training program details can be accessed from below link:
https://www.cambiumnetworks.com/training/
Содержание PMP 450 AP
Страница 79: ...Chapter 2 System hardware System Components Page 2 29 Figure 20 Gigabit Enet Capable power supply...
Страница 160: ...Chapter 3 System planning Radio Frequency planning Page 3 30 Figure 55 Sector Antenna...
Страница 161: ...Chapter 3 System planning Radio Frequency planning Page 3 31 Figure 56 cnMedusa Antenna...
Страница 189: ...Chapter 3 System planning Remote AP Deployment Page 3 59 Figure 65 Remote AP wired to SM that serves as a relay...