Chapter 3: System planning
Typical deployment
Page
3-4
Figure 48 Roof installation
Air terminals (finials)
Tower grounding
conductor
Building ground ring
AC
service
Equipment room
ODU
ODU ground cables
Network CAT5e cable
Site grounding system
AC
supply
PSU
Network
equipment
Bottom LPU
Building entry point
Drop cable inside building
Equipment room entry point
Power over Ethernet CAT5e cable
(gel-filled, shielded with copper-
plated steel)
Содержание PMP 450 AP
Страница 79: ...Chapter 2 System hardware System Components Page 2 29 Figure 20 Gigabit Enet Capable power supply...
Страница 160: ...Chapter 3 System planning Radio Frequency planning Page 3 30 Figure 55 Sector Antenna...
Страница 161: ...Chapter 3 System planning Radio Frequency planning Page 3 31 Figure 56 cnMedusa Antenna...
Страница 189: ...Chapter 3 System planning Remote AP Deployment Page 3 59 Figure 65 Remote AP wired to SM that serves as a relay...