CS3000 User’s Guide
36
Calsense
Note:
The Stop Time value will stop all irrigation for that group at that time. Any group not using
a stop time will continue until the irrigation is complete.
5.
Navigate to Mow day use
+/-
to select a day of the week.
Note:
Mow day is a specific day of the week were irrigation will be skipped within the 24-hour
period starting at 8PM the day before until 8pm the next day.
6.
Navigate to and select Days to water and use
+/-
to select desired schedule. If Odd days were
selected:
7.
Navigate to Irrigate on the 1st after the 29th or 31st and use
+/-
to select Yes or No.
•
If Weekly schedule was selected:
i.
Navigate to desired day of the week and use
+/-
to turn On or Off.
ii.
Use ET Averaging (smooths run times) field appears. Use
+/-
to select Yes or No.
8.
When finished, press BACK to save changes, and return to Main Menu.
Prioritizing Station Groups
The Priorities feature allows station groups to irrigate before other groups depending on the priority
level: High, Medium, and Low. Priority levels establish the order of which station groups to water. The
station group or groups with high priority will irrigate first, the station groups with medium priority will
irrigate second, and the station group with low priority will irrigate last.
Note
: If scheduled irrigation
exceeds the stop time, stations with low priority may not irrigate.
To edit the Priorities screen (Figure 25):
1.
From the Main Menu, navigate to
Scheduled Irrigation
and select
Priorities
. The Priorities
screen displays.
2.
Navigate to desired Station Group and use
+/-
to change priority level:
•
High – A Station Group with a high priority will irrigate first.
•
Medium – A Station Group with a medium priority will irrigate second.
•
Low – A Station Group with a low priority will irrigate last or not at all.
3.
When finished, press
BACK
to save changes, and return to Main Menu.
Figure 25: Priorities Screen
Содержание CS3000
Страница 1: ...CS3000 USER S GUIDE...