Calix ODC-80 Installation Guide
23
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2003 Calix. All Rights Reserved.
Seal the cabinet
Procedure to seal the cabinet
Step
Action
1.
Remove the lifting details from the sides of the cabinets.
2.
Cap the lift mount holes with the hole plugs
shipped in the bag attached to the lift detail.
3.
Cover any unused cable entry ports with the blank plates provided.
Содержание ODC-80
Страница 1: ...Calix ODC 80 Installation Guide July 2003 Part 220 00029 Rev 11 ...
Страница 2: ......
Страница 6: ......
Страница 7: ...1 Chapter Before You Begin Installing the ODC 80 ...
Страница 8: ......
Страница 23: ...2 Chapter Placing the ODC 80 on a Pad ...
Страница 24: ......
Страница 30: ......
Страница 31: ...3 Chapter Installing Power Subscriber Cables and Equipment ...
Страница 32: ......
Страница 74: ......
Страница 75: ...4 Chapter Maintaining and Troubleshooting the ODC 80 ...
Страница 76: ......
Страница 80: ......
Страница 92: ......
Страница 103: ...5 Chapter Reference ...
Страница 104: ......
Страница 106: ......