28
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
4.
Slide the grommet into its channel on the ONT chassis. Trim any excess tie-wrap
material.
5.
Let the power cord connector hang loose temporarily.
Power Supply
Connector
Incoming Power
Cable
Tie-Wrap Power
Cord Here
Tie-Wrap Power
Cord Here
5232
Making the Fiber Connection
To make the fiber connection
1.
Remove the splice tray cover by pulling out on, popping the cover off the splice tray.
2.
Remove the splice tray by removing the screw in the center of the tray.
3.
Strip approximately 86” (218 cm) of fiber from the drop cable, leaving the buffer tube
intact but exposed. This will allow sufficient length to make two complete loops around
the Fiber Management Tab.
4.
Clean the water repellent gel from the buffer tube.
© 2001-2007 Calix. All Rights Reserved.
Содержание 560 SBU ONT
Страница 1: ...Calix 560 SBU ONT Installation Guide November 2007 220 00215 Rev 11...
Страница 2: ......