User Manual – Rev B
FCS Series II
This test will generate a 5% THD voltage distortion on the output voltage waveform. Using a
clipped sine wave causes the distortion. The test will last for 2 minutes. The
←
key (backspace)
the test at any time.
HIGH V
For
0
msec before returnin
For
c.
place if the power source is set for the
ltage range.
will cause the E
to loose power momentarily. If this is not acceptable,
er so
in
tim
this seq
5
d
be
d
min
vo
e
space)
ina
tes
im
LOW VOLTAGE TRANSIENT
:
For 400 Hz and VFREQ:
10msec.
•
Stay at 108V for 95msec before returning to 115V.
0V for 1.67msec.
•
Line
ea
0V
sec
Line
ea
05
m
•
Stay at 105V for 75ms
After this sequence, a 5 second delay will be inserted at the nominal test voltage. The
←
key
IGH FREQUENCY TRANSIENT
This test will change the output frequency in the following sequence:
For 400Hz and VFREQ:
•
425Hz for 1 sec.
•
420Hz for 4 sec.
will terminate
OLTAGE TRANSIENT
This test will change the output voltage for the selected phase in the following sequence:
40 Hz and VFREQ:
•
180V for 10msec.
•
Linearly reduced to118V in 78msec.
•
Stay at 118V for 87
g to 115V.
60 Hz only:
•
170V for 1.67msec
•
Linearly reduced to 130V in 14msec.
•
Linearly reduced to 120V in 83.3msec.
•
Stay at 120V for 75mse
Note:
Prior to the test, a voltage range change may take
low vo
t e pow
This
ust
UT
nge
h
urce m
be left high ra
at all
es.
After
(back
uence, a
will term
d
secon
te the
elay will
t at any t
e
insert
e.
at the no
al test
ltage. Th
←
key
This test will change the output voltage for the selected phase only in the following sequence
•
80V for
•
Linearly increase to108V in 70msec.
For 60Hz only:
•
arly incr se to 7
in 14m
.
•
arly incr se to 1 V in 83.3 sec
ec.
(backspace) will terminate the test at any time.
H
California Instruments
134
Содержание FCS Series II
Страница 4: ...User Manual Rev B FCS Series II California Instruments 4...
Страница 27: ...User Manual Rev B FCS Series II California Instruments 27...
Страница 28: ...User Manual Rev B FCS Series II Figure 3 1 Rear Panel Connector Locations California Instruments 28...
Страница 35: ...User Manual Rev B FCS Series II Figure 3 4 FCS54 3 3 Wiring Diagram Three Phase mode California Instruments 35...
Страница 36: ...User Manual Rev B FCS Series II Figure 3 5 FCS54 3 1 Wiring Diagram Single Phase mode California Instruments 36...
Страница 89: ...FCS Series II 89 Figure 5 1 FCS System Block Diagram User Manual Rev B California Instruments...
Страница 92: ...User Manual Rev B FCS Series II Figure 5 2 Power Amplifier Exploded View California Instruments 92...
Страница 95: ...User Manual Rev B FCS Series II Figure 6 1 Calibration Setup California Instruments 95...
Страница 109: ...User Manual Rev B FCS Series II Figure 7 1 Front panel location Figure 7 2 Fuse Locations California Instruments 109...
Страница 118: ...User Manual Rev B FCS Series II ure 8 4 Voltage Modulation Frequency characteristics Fig California Instruments 118...