
CalAmp | TTU-7xx Install Guide
MBUD-0239v2
Page 19
9 FLATBED SCREW MOUNT INSTALLATION
The following steps outline the procedure for Flatbed Screw Mount Installation. Prior to beginning the
installation, verify that you have the proper tools and materials.
Tools and Materials:
Cordless Drill
3/16” Drill Bit
3/8” Open-End Wrench
5/16” Socket – ¼” Drive
Scratch Awl
Rust Preventative Spray Paint (Black or Primer Color)
To Install Flatbed Screw Mount:
1.
Tag equipment with appropriate signage to indicate Lockout/Tagout procedure is in process.
Installers should be properly trained in LOTO procedures in accordance with OSHA regulations.
2.
Set the parking brake.
3.
If the equipment is parked on an incline, chock the wheels.
4.
Block or crib equipment that is suspended on jacks in order to prevent falling or shifting.
Figure 8: TTU-7xx Device Label
5.
Record the Electronic Serial Number (ESN) located on the device label and the Trailer Number.