Assembly and Installation
NOTE: Allow the speed set to dry before proceeding with the next step.
8.
Using a small brush or hopper gun, apply stucco to the seam line (Figure 16 and Figure 17).
Figure 16
Figure 17
9.
Mix grout with water in a container.
10.
Fill the tile seam line with grout using a small spatula or your finger (Figure 18).
11.
Clean the grout with a damp rag (Figure 19).
12.
Let the grout and stucco dry for at least three hours.
Figure 18
Figure 19
Rock / Stone Assembly
For Models G-2500, G-2500F, G-2600, G-3000, G-3500F, G-3600
1.
Place the island sections together on the ground.
2.
Make sure the ground where the barbecue is place is as level as possible for best alignment.
NOTE: If the ground is not level, use shims to level out the island sections. This needs to be done before you
place the bolts.
3.
Connect the speakers, lights, and main power cables before sliding the sections together.
4.
Insert the bolts through the pre-drilled holes from the inside of the barbecue island (total of four bolts on
each side).
5.
Insert the upper bolts as shown. Tighten the bolts all the way using a 9/16" wrench.
2005 Spa Owner's Manual
Page 13
6.
Prepare mortar in a container.
7/21/2005
Содержание 2005 Spa
Страница 1: ...LTR20051000 Rev D 7 21 2005...
Страница 31: ...Operating Your Barbecue 2005 Spa Owner s Manual Page 27 7 21 2005...
Страница 62: ......
Страница 63: ...LTR20051000 Rev D 7 21 2005...