TOTAL LITE Revision 1
SERVICE MANUAL FOR INNOVATION
TOTAL LITE
Single-Cup Brewer
3
Table of Contents
7 INITIAL SETUP .......................................................................................................
35
7.1 Installation site requirements ..............................................................
35
7.1.1 Clearances ............................................................................ 36
7.1.2 Specifications ....................................................................... 36
7.2 Unpacking .............................................................................................
37
7.3 Levelling the Equipment.......................................................................
38
7.4 Hot Water Tank Preparation ................................................................
38
7.4.1 Tank Lid Preparation ............................................................ 38
7.4.2 Adjusting the Tank Overflow Float ..................................... 39
7.5 3 Beans canister installation ...............................................................
39
7.5.1 Install the 3 Beans Canister ................................................ 39
7.5.2 Lock the 3 Bean canister ..................................................... 40
7.5.3 Install the Plastic Top fitting part ........................................ 40
7.5.4 Install the Plastic Top ......................................................... 40
7.6 Water Line Connection .........................................................................
41
7.7 Electrical Connection ...........................................................................
42
7.8 Water Temperature ................................................................................
43
7.9 Loading Products..................................................................................
44
7.10 Chute System Installation ....................................................................
45
7.11 Filter Paper Installation ........................................................................
46
7.12 Installation Testing ................................................................................
47
8 CLEANING AND SANITIZING ................................................................................
48
8.1 Cleaning and Sanitizing Instructions ..................................................
48
8.2 Recommended Cleaning Tools ............................................................
48
8.3 Cleaning and Sanitizing Schedule.......................................................
49
8.4 Overall Cleaning ...................................................................................
49
8.5 Automatic Rinsing Function ................................................................
50
8.6 Exterior Cleaning ..................................................................................
50
8.6.1 Cleaning the drip tray .......................................................... 50
8.6.2 Emptying the waste bin ....................................................... 51
8.7 Interior Parts Cleaning & Sanitizing ....................................................
52
8.7.1 Coffee Canisters ................................................................... 52
8.7.2 Soluble Canisters ................................................................. 53
8.6.3 Coffee Brewer ....................................................................... 54
8.6.4 Fan ......................................................................................... 55
8.6.5 Stainless coffee chute ......................................................... 56
8.6.6 Plastic chute of the 3 bean canister ................................... 57
9 PREVENTIVE MAINTENANCE ..............................................................................
58
9.1 Preventive Maintenance (PM) Schedule .............................................
58
9.2 Brewer Assembly .................................................................................
59
9.3 Water Outlet Valves ..............................................................................
60
9.4 Hot Water Tank ......................................................................................
61
10 SERVICING PARTS ................................................................................................
62
10.1 Draining the Hot Water Tank ................................................................
62
10.2 Shutdown / Storage ..............................................................................
63
10.2.1 Storing the Brewer Assembly ............................................. 63
Table of Contents Continued