INNOVATION TOTAL LITE Rev. 11 05/2018
73
www.cafection.com 800-561-6162
SERVICE & INSTALLATION MANUAL for Innovation Series’ Total Lite
9
PARTS MAINTENANCE
This section covers the servicing of various parts of the unit.
9.1
Hot Water Tank Draining
Cafection recommends allowing three (3) hours for the water to cool down prior to emptying the
tank. Make sure a bucket of a minimum of 0.8 gallon suitable for holding hot water is available.
1. Turn the brewer OFF and unplug it from the electrical outlet.
2. Cut off the main water supply of the machine.
3. Open the front door.
4. Locate the drain tube (red plug).
5. Place the tube into the bucket and remove the red plug.
Warning! Water may be hot!
6. Completely drain water from the tank.
7. Reinstall by repeating the steps in reverse order.
Drain tube
Red plug
Bucket
(0.8 gallon minimum)
P
a
rt
s Ma
in
te
na
nc
e