background image

INNOVATION TOTAL LITE Rev. 11  05/2018

www.cafection.com      800-561-6162

70

SERVICE & INSTALLATION MANUAL for Innovation Series’ Total Lite

8.3 

Outlet Valves 

Inspection: quarterly
Preventive maintenance: every 10,000 cycles

To avoid any issue related to mineral deposits, Cafection recommends rebuilding all five (5) outlet 
valves at the same time using the valve repair kits (PETAN45, one kit needed for each valve). The 
manufacturer’s instructions are provided with each valve kit.

Valve Leakage

Identify the leaking valve, change it or rebuild it.

If the leak originates from under the body of the valve or from the tank exit, try changing the conical 
mounting seal in the first instance.

If the coffee valve is not watertight, water will accumulate in the brew chamber.  

If it drips all night, the first coffee of the morning will be lukewarm.  

The leakage may also cause the chamber to flood.

Caution! Water is very hot!

Removing and Installing the Valves

1.  Turn the machine OFF.
2.  Unplug the lid’s connectors (fig. 1.1) and the valves (fig. 1.2).
3.  Completely drain water from the tank (see section 9.1).
4.  Remove the tubes.
5.  Unscrew the guard to be able to remove the tank.
6.  Tilt the tank forward to have access to the valves.
7.  Remove the valves. Replace or rebuild them.
8.  Reinstall by repeating the steps in reverse order.

If a water filtration system is installed on the brewer, 

it is recommended to inspect it on a monthly basis.

Tank guard

Valves

Fig. 1.1

Tank lid

Connectors

Double Valve

Fig. 1.2

Valves

Single Valve

Conical 
mounting seals

P

re

v

e

n

ti

v

e Ma

in

te

na

nc

e

Содержание Total Lite Innovation Series

Страница 1: ...ort bean hopper SERVICE INSTALLATION MANUAL for Innovation Series Total Lite Manufactured by Cafection Ventures Inc 2355 avenue Dalton Qu bec Qu bec G1P 3S3 Canada Tel 800 561 6162 Fax 800 463 2739 se...

Страница 2: ...ting Environment 14 4 1 2 Power Supply 14 4 1 3 Water Supply 14 4 1 4 Tools Required 14 4 1 5 Clearance 14 4 2 Specifications 15 4 2 1 Hopper Canister capacities 15 4 2 2 Water Tank 15 4 2 3 Electrica...

Страница 3: ...System1 Subtab 46 6 6 2 System 2 Subtab 47 6 6 2 System 2 Subtab Continued 48 6 6 3 Tools Subtab 49 6 6 4 Network Subtab 50 6 6 4 Network Subtab Continued 51 6 6 4 Network Subtab Continued 52 6 6 4 N...

Страница 4: ...Grinder 72 9 PARTS MAINTENANCE 73 9 1 Hot Water Tank Draining 73 9 2 Shutdown and Storage 74 8 2 1 Storing the Brew Group 74 9 3 Brew Group Assembly 75 9 4 Main Board 76 10 TROUBLESHOOTING 77 10 1 Wa...

Страница 5: ...an for its intended use This equipment contains hot water Never move it when full This brewing equipment is intended for indoor use only 1 3 Power Supply Always use a grounded 120 VAC 60 Hz socket out...

Страница 6: ...he following circumstances will void the warranty policy Use of substitute parts not manufactured or approved by Cafection Improper installation or operation of the equipment Abuse or neglect includin...

Страница 7: ...l or equivalent parts if warranty is applicable Only warranted parts are authorized for return Cafection suggests keeping replacement parts on hand The warranty covers regular shipping only Overnight...

Страница 8: ...800 561 6162 8 SERVICE INSTALLATION MANUAL for Innovation Series Total Lite 3 REFERENCE DRAWINGS 3 1 External View Drip tray grill Drip tray Back splash Touch screen Door lock Metal door Plastic front...

Страница 9: ...r View Water tank Outlet valve Overflow cup Water inlet Breaker box Back panel Level glides Overflow tray Water tank access door Top fitting part IF YOUR MACHINE IS EQUIPPED WITH A LAN PORT RJ45 BE CA...

Страница 10: ...for Innovation Series Total Lite 3 3 Internal view Filter paper Soluble mixing chamber Brew group Spout Waste bin Main board See section 4 15 Front panel Coffee grinder Behind the protector COM connec...

Страница 11: ...11 www cafection com 800 561 6162 SERVICE INSTALLATION MANUAL for Innovation Series Total Lite 3 4 Brewer Assembly Brew chamber Cylinder Piston Coffee spillway Aluminum frame Wheel Serial number on th...

Страница 12: ...the appropriate strength At the end of the pause time there will be one shot of water to clean the brew chamber Step 3 Descent of the piston The descent of the piston creates a vacuum allowing to ext...

Страница 13: ...ged when servicing Access the hot water tank by removing the back panel See images below for tank lid details See section 8 4 for preventive maintenance Heater safety switch Left Side View Water level...

Страница 14: ...ide diameter dedicated line branched off a larger line An easily accessible shut off valve up stream of the unit is highly recommended for ease of installation Water pressure should be at least 20 PSI...

Страница 15: ...hole bean hopper left section 4 lbs Whole bean hopper middle section 2 lbs Whole bean hopper right section 4 lbs Soluble hot chocolate 2 5 lbs Soluble vanilla powder 2 lbs or 1 lb of soluble milk powd...

Страница 16: ...y need to be installed on the equipment Here is a list of all accessories and their location when packed In the hopper box 1 Bean Hopper In the internal waste bin 2 Internal Waste Bin 3 Drip Tray Gril...

Страница 17: ...e will then stop automatically It is important to verify that the float is positioned properly in the overflow cup because it can move around in transportation If the float is not properly in place th...

Страница 18: ...hopper forward in place and pivot the two locks on its back so they clip on the metal pins The left soluble canister might need to be removed to access the latches Position the bean funnel protector...

Страница 19: ...il This will ensure no sediment from a new installation gets in the equipment 2 The incoming water supply must have a shut off valve connected in line Water supply should be a plastic 1 4 or 3 8 outsi...

Страница 20: ...unit s power cord and remove it from its transport socket Discard the transport water tank safety part recyclable The transport water tank safety part keeps the float out from moving during transport...

Страница 21: ...to heat the new incoming water up to the setpoint Water s brewing temperature can also be taken manually by ordering a cup of hot water and measuring its temperature with a thermometer There may be a...

Страница 22: ...LLATION MANUAL for Innovation Series Total Lite 4 10 Drip Tray Installation Place the drip tray grill on the drip tray include in the accessories box Then slide the tray under the machine and find the...

Страница 23: ...anisters 3 11 2 Bean Hopper Unlock and open the cover of the bean hopper Do not overfill the three 3 sections of the hopper Using a step stool will facilitate the filling of each section of the hopper...

Страница 24: ...e Front panel Waste chute Chute base 4 12 Chute Kit Installation Optional 1 Open the brewer s door 2 Insert the chute base inside the chute hole of the cabinet 3 Insert the waste chute into the chute...

Страница 25: ...per button and follow the instructions on the screen The brew chamber will not lift up if the switch does not detect any filter paper 3 Pass the filter paper under the left guide bracket of the brew g...

Страница 26: ...der Make sure that the brewer is clean safe and functioning once it is ready to be left on site What to verify Inlet valve is free of leaks Verify that it is secured and not overtightened Brew chamber...

Страница 27: ...in board This is a schematic reference drawing only Not to scale 4 15 Main Board J11 MDB port Coin changer bill acceptor card reader J12 Thermostat board J22 Numeric input switches J14 COM port link t...

Страница 28: ...nables you to reset many settings back to factory Configuration settings passwords and drink settings LEDs light up to indicate the following statuses DS1 Power 5V OK DS15 Low water level DS13 Brewer...

Страница 29: ...the flash card 1 Remove the main board protective cover 2 Pull the flash card outward To install the flash card 1 Make sure the colored side of the card is on the right 2 Insert the flash card and pu...

Страница 30: ...k allowing the customer to insert multiple bills in a single transaction That is why a customer cannot cancel the vend and have the bill returned If the vend is canceled the value of the bill inserted...

Страница 31: ...INSTALLATION MANUAL for Innovation Series Total Lite 5 USER INTERFACE 5 1 Selection Interface The user interface is divided into five 5 steps 1 Select a drink family 2 Select a beverage family 3 Selec...

Страница 32: ...Go to Brew Additional Options Whip Coffee Milk If Coffee 50 50 has been ordered an additional screen will be displayed to select both coffee blends Hot water is available in all three 3 beverage fami...

Страница 33: ...When selecting the Hot Beverages and the Gourmet families Additional Option Whip Coffee coffee based beverages Milk If the beverage selection contains coffee an additional screen will be displayed to...

Страница 34: ...rink is counted as a free vend in the sales counters When pressing the Fill up a Carafe button in Service mode the screen will automatically return to the selection interface The carafe icon top right...

Страница 35: ...ne is required The iced coffee is prepared in a 12 oz size You can modify the size by changing the amount of water in the beverage but the screen interface will still suggest using a 12 oz glass 1 Sel...

Страница 36: ...ouchscreen to help people who are not able to reach the screen or are not comfortable using it to order coffee easily To activate the selection keyboard customers need to press any of its keys Using t...

Страница 37: ...sks Recipes modification and system settings access Access to all tabs and subtabs in Service mode with the exception of the Audit tab and the Admin subtab Factory password for this level tech Level 4...

Страница 38: ...on to OFF when Free Vend is not activated When Free Vend is enabled the coin bill and card payment devices will automatically be disabled 3 This button is used to rinse the brew group and the whipper...

Страница 39: ...ring interface to send an order through Cafection s Management Tool PRO It is only available when the coffee brewer is connected to a cellular or a wireless network The user must enter his email and s...

Страница 40: ...mends setting the alert at 25 Products Levels Interface Filter Paper and Soluble Canisters Section The user first needs to estimate the level of filter paper in coffee cups and soluble powders in by r...

Страница 41: ...t 8 Time and date Date and time can be set in the Tools subtab under the System tab 9 Cup detector status optional 10 Network status Many possible statuses Disabled Network is offline Invalid serial n...

Страница 42: ...ame that will be shown on the selection screen If the language of the system is changed the name of the products will be reset to factory settings 3 This dropdown menu is used to determine in which dr...

Страница 43: ...represent the amount of time the motor is running 20 units 1 second The right section of the numeric keypad indicates an estimated conversion of the value in units to a milliliter ml and to a US flui...

Страница 44: ...units Three 3 stirring cycles when the total quantity of water is dispensed in three 3 shots The mix is stirred three 3 times ensuring that the coffee completely comes into contact with water Ideal f...

Страница 45: ...the issue 20 units 1 second Pause 4 Brew group drain time This setting must be high enough to empty the brew group at the end of the cycle 20 units 1 second This interface is used to set all coffee d...

Страница 46: ...in the tank in Fahrenheit If the water temperature drops below this setting the coffee brewer will display an error message until the temperature rises above this minimum To disable this feature set...

Страница 47: ...button gives access to the Maintenance interface This interface displays the maintenance counters where each use of a component is recorded The components requiring maintenance are highlighted in red...

Страница 48: ...Vend mode By pressing the and buttons the user can set the time frames during which the drinks will be free For more help press the icon 5 This button creates a backup file on the coffee brewer The f...

Страница 49: ...ool Error Log 3 This button is used to view the coin changer status If there is no coin changer in the machine or if it is not plugged correctly this button will not be visible 4 This button is used t...

Страница 50: ...the machine must be disconnected 6 6 4 Network Subtab This section is used to connect the brewer to the internet Use the checkboxes on the left to select the desired connection Ethernet Cable Wired N...

Страница 51: ...rmine the type of security select it manually The person in charge of IT on site will be able to provide this information The coffee brewer is compatible with the following encryption methods No encry...

Страница 52: ...to ensure the best possible signal The antenna is located at the back of the machine inside the water tank compartment and needs to be pulled out To do so follow the instructions provided with the ma...

Страница 53: ...three 3 ways to verify if the brewer has successfully been connected 1 Under the Status tab The network status indicates Cell Modem link OK or Wi Fi link OK 2 In Service mode under the System tab in t...

Страница 54: ...om 1 to 9999 for a minimum security a PIN of four 4 digits is recommended Check the box of each authorization that needs to be granted to this user Press on Exit and save changes If at least one 1 use...

Страница 55: ...ement Tool the serial number must be the same as the one on the sticker inside the machine under the fan It is important to enter the serial number of the machine every time the flash card is replaced...

Страница 56: ...d inside the door and select the Audit tab 6 7 1 Permanent Sales Count This counter records the quantity of drinks sold since the machine as been manufactured 6 7 2 Erasable Sales Count This counter r...

Страница 57: ...The Erasable and Permanent Sales Counts of the Mokaccino increases by 8 under Large in the Free section Example 2 User 2 enables the Free Vend mode and orders 10 x small Coffee 3 2 x medium Long Espre...

Страница 58: ...es including food soils oil or mineral deposits that could alter the beverage taste and quality Sanitizing Sanitizing ensure the customers health safety by killing bacteria remaining on the surfaces a...

Страница 59: ...cleaning schedule and instructions outlined in this manual must be followed to honor the warranty ensure consistent product quality and maintain high level of health safety All parts must be visually...

Страница 60: ...exterior of the unit and the base cabinet After removing all food soils thoroughly dry with a clean soft cloth Non food contact parts to be verified and cleaned Plastic top lid Cabinet optional Metal...

Страница 61: ...System tab in Service mode see section 6 6 1 How to empty the cabinet waste bin 1 Open the cabinet door below the brewer 2 Open the brewer s door and remove the front panel 3 Cut the filter paper 4 be...

Страница 62: ...ater Interior parts to be cleaned Bean hopper Soluble canisters Soluble whipper assembly Brew group assembly Fan Stainless coffee chute Bean hopper plastic funnel 7 7 1 Bean Hopper Frequency monthly o...

Страница 63: ...dry completely 5 Reinstall all parts in reverse order 6 Order a large beverage of each soluble to ensure that all parts and switches are working properly Soluble Canisters Frequency monthly or every 1...

Страница 64: ...ace a container large enough size specified on the screen Water is HOT The funnel should be cleaned weekly or more often if needed To clean the funnel follow steps 3 to 5 Brew Group Assembly Frequency...

Страница 65: ...e Sample button then press on the Water Only button 6 When water mixes with the urn cleaner stir around with a paintbrush As soon as water stops dispensing turn off the machine 7 Allow the cylinder to...

Страница 66: ...before reinstalling 8 Repeat steps in reverse order to reinstall the chute and solenoid Stainless coffee chute Red connector at the front Stainless coffee chute screws Black connector at the back With...

Страница 67: ...machine 2 Remove the plastic top lid 3 Unscrew and remove the top fitting part 4 Remove the grinder protector and pivot the two 2 locks in order to release the bean hopper Remove the hopper 5 Clean t...

Страница 68: ...ife of the coffee machine and deliver a consistent high quality beverage The preventive maintenance schedule and instructions below must be followed to honor the warranty 8 1 Preventive Maintenance PM...

Страница 69: ...rmed on the actual brew group of the unit Cafection will completely clean and replace all parts requiring maintenance including the screen and seal the cylinder and the piston seal The cleaned brew gr...

Страница 70: ...stance If the coffee valve is not watertight water will accumulate in the brew chamber If it drips all night the first coffee of the morning will be lukewarm The leakage may also cause the chamber to...

Страница 71: ...ion recommends having the water tank assembly delimed to remove all scale in the unit The heating element the temperature probe the water level and heater safety switches may also need to be replaced...

Страница 72: ...urr grinder ensures perfect coffee grinding The ground coffee particles size playing a key role in the coffee extraction and taste it is important to change the grinder s burrs in accordance with the...

Страница 73: ...ior to emptying the tank Make sure a bucket of a minimum of 0 8 gallon suitable for holding hot water is available 1 Turn the brewer OFF and unplug it from the electrical outlet 2 Cut off the main wat...

Страница 74: ...5 1 6 Tie down the water level switch s arm with a cable tie tie wrap to keep the float still during transportation Do not overtighten as this may damage the switch The purpose of this operation is on...

Страница 75: ...bracket from the right side of the brewer assembly 6 Support the brewer assembly by holding the aluminum frame on the right side of the brewer assembly 7 With your left hand slide the retaining pin o...

Страница 76: ...screws 4 Unplug the connections Clockwise from the top left corner MDB Port J11 if coin changer bill acceptor or card reader Main Board J12 J18 J27 J2 J19 J3 J6 J14 J21 J22 5 Unscrew 4 plastic 1 post...

Страница 77: ...15 1 RINSE REQUIRED SOON The number of drinks served has reached the Rinse at parameter set in Service mode see section 6 6 1 All drinks will continue to be dispensed The warning will be displayed on...

Страница 78: ...e section 4 5 1 WATER TEMP SENSOR DEFECTIVE SHORT CIRCUIT The water tank temperature probe is defective due to a short circuit see section 4 5 1 BREW GROUP STARTING POSITION SWITCH ERROR The brew grou...

Страница 79: ...Check the water supply line to ensure that the pressure is adequate If the machine uses a waterline filter it might be worn out and needs to be replaced Press on the Restart Filling button on the err...

Страница 80: ...Brew Group Exchange Program Replace the whipping motor s 25 000 cycles Delime the water tank outlet valves 50 000 cycles Replace the grinder burrs Replace the water tank float the heater switch the w...

Страница 81: ...er mixes with the urn cleaner stir around with a paintbrush As soon as water stops dispensing turn off the machine Allow the cylinder to soak for 5 minutes then turn the machine back on Wait for the m...

Страница 82: ...el Sanitize the brew chamber with a hot water cycle Sanitize the soluble mixing bowl with a hot water cycle Capture data from the software Verify the overflow cup Verify the overflow drip tray PREVENT...

Страница 83: ...INNOVATION TOTAL LITE Rev 11 05 2018 83 www cafection com 800 561 6162 SERVICE INSTALLATION MANUAL for Innovation Series Total Lite Annex 4 ANNEX 4 WASTE CHUTE POSITION...

Страница 84: ...INNOVATION TOTAL LITE Rev 11 05 2018 www cafection com 800 561 6162 84 SERVICE INSTALLATION MANUAL for Innovation Series Total Lite ANNEX 5 REQUIRED CLEARANCE Annex 5...

Отзывы: