INNOVATION TOTAL LITE Rev. 11 05/2018
www.cafection.com 800-561-6162
26
SERVICE & INSTALLATION MANUAL for Innovation Series’ Total Lite
4.14 Installation Verification
It is important to perform several brew cycles on the equipment before completing the installation. At
least two (2) cups of each product selection should be ordered to ensure that the brewer is operating
as per the specifications laid out in this manual. During this process, review the following checklist as a
reminder.
Make sure that the brewer is clean, safe and functioning once it is ready to be left on-site.
What to verify
Inlet valve is free of leaks.
Verify that it is secured and not overtightened.
Brew chamber is empty of coffee.
Verify that the unit is leveled.
Filter paper feeds without resistance and goes
straight into the waste bin.
Verify that the chute is properly installed.
Repeat the installation procedure if needed.
Soluble mixing bowl is free of leaks.
Verify that it is installed straight and that the
tube is secured.
Water temperature is acceptable.
Verify water temperature.
Products are loaded.
Load products.
Brewer and area are clean and tidy.
Clean and tidy up.
In
it
ia
l S
e
tu
p