INNOVATION TOTAL LITE Rev. 11 05/2018
www.cafection.com 800-561-6162
24
SERVICE & INSTALLATION MANUAL for Innovation Series’ Total Lite
Front panel
Waste chute
Chute base
4.12 Chute Kit Installation (Optional)
1. Open the brewer’s door.
2. Insert the chute base inside the chute hole of the cabinet.
3. Insert the waste chute into the chute base.
4. Install the front panel by aligning its metal bracket with the metal bracket fixed on the brew
group assembly.
In
it
ia
l S
e
tu
p