INNOVATION TOTAL LITE Rev. 1 2021-10
71
www.cafection.com 800-561-6162
SERVICE & INSTALLATION MANUAL for Cafection’s Total Lite
8.2
Brew Group Assembly
Preventive maintenance: yearly or every 25,000 coffee cycles
The brew group is the heart of the equipment and is responsible for the taste of every cup. It needs
to be serviced regularly to maintain the quality of the beverages served.
Cafection offers a Brew Group Exchange Program. This program ensures a constant running of
the machine by receiving a replacement brew group to use while maintenance is performed on
the actual brew group of the unit. Cafection will completely clean and replace all parts requiring
maintenance, including the screen and seal, the cylinder and the piston seal.
The cleaned brew group will be returned with a one (1) year warranty on defective parts.
Contact Cafection’s Technical Support at [email protected] or 800-561-6162,
ext. 310 to order parts or for additional information.
Inspection
Frequency: monthly
The following are signs that the
coffee extraction is not being
performed adequately and that
the brew group may require
preventive maintenance:
- Seal is damaged.
- Air gets into the cylinder and
creates bubbles in the coffee.
- Coffee grounds in the coffee
dispensed.
- Spent coffee grounds remain
wet on filter paper.
Screen and seal
Cylinder
Piston
seal
Brew chamber
P
re
v
e
n
tiv
e Ma
in
te
na
nc
e