
©2020 CAE 905K710052 v.1.1
41
Setup
Power Supply
The ventilator should be connected to an external AC power source for battery charging and when
the ventilator is in use.
• Ensure a multi-plug AC power outlet exists in the workspace to charge the ventilator and
its powered components.
• Ensure that the voltage of the supply meets the product specifications in the
Specifications
section of this guide. Applying voltage that is too high will damage the equipment.
• Plug in the ventilator to a power source using only the power cord provided. Use the
diagram provided in the
Unpacking Instructions t
o identify the designated cord associated
with this equipment.
• Power on the ventilator for a minimum of four hours prior to first use by pressing the
Power button on the front of the CAE Air1 to charge the backup Lithium-ion battery. The
four hours to charge the Lithium-ion battery are additional to the 12 hours for the UPS
battery to charge.
Note:
This preparation step should take place before the ventilator is ready to be used
and setup for a patient to be connected (as noted in the
Setup Procedure
section). Aside
from charging the Lithium-ion battery, do not power on any components until instructed
to do so in the
Setup Procedure
section of this user guide.
Cleaning and Disinfecting before Use
Clean and disinfect the ventilator prior to placing in a patient room or work area. See the
Care and
Maintenance
section of this guide for approved disinfecting products.
Setup Procedure
After unpacking the ventilator and completing the setup preparation, follow the setup procedure
steps.
Setup Procedure
1
Place Ventilator in Work Area
2
Connect the Oxygen Supply (Optional)
3
Replace Ventilator Filters
4
Connect Patient Breathing Circuit
5
Power On Ventilator
6
Perform Self Test
7
Perform Breathing Circuit Characterization Test
8
Perform O
2
Calibration (prior to first use)
Содержание Air1
Страница 1: ...CAEAir1 Mechanical Ventilator User Guide...
Страница 7: ...vi 2020 CAE 905K710052 v 1 1 CAEAir1 INTENTIONALLY LEFT BLANK...
Страница 9: ...Specifications 2 2020 CAE 905K710052 v 1 1 CAEAir1 INTENTIONALLY LEFT BLANK...
Страница 33: ...Safety 26 2020 CAE 905K710052 v 1 1 CAEAir1 INTENTIONALLY LEFT BLANK...
Страница 37: ...Introduction 30 2020 CAE 905K710052 v 1 1 CAEAir1 INTENTIONALLY LEFT BLANK...
Страница 45: ...Equipment Overview 38 2020 CAE 905K710052 v 1 1 CAEAir1 INTENTIONALLY LEFT BLANK...
Страница 80: ...2020 CAE 905K710052 v 1 1 75 Interface Overview Setup Screen PC Mode Setup Screen PS Mode Setup Screen VC Mode...
Страница 131: ...Troubleshooting 126 2020 CAE 905K710052 v 1 1 CAEAir1 INTENTIONALLY LEFT BLANK...
Страница 135: ...Appendix A Parameter Descriptions 130 2020 CAE 905K710052 v 1 1 CAEAir1 INTENTIONALLY LEFT BLANK...
Страница 153: ...Appendix F Applicable Standards 148 2020 CAE 905K710052 v 1 1 CAEAir1 INTENTIONALLY LEFT BLANK...