![Cadman 3NMB Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/cadman/3nmb/3nmb_operator-and-maintenance-manual_3258770035.webp)
TR-MAN-3NMB
Operator's Manual - 3NMB
Page 34 of 39
Cadman Power Equipment
▪
BOX 100, Courtland, Ontario, Canada N0J-1E0
▪
Phone: 519-688-2222
▪
Fax: 519-688-2100
▪
www.cadmanpower.com
Optional Flow Meter
Installing optional flow meter
Step 1
Remove bolts fastening old riser tube and take old riser tube out of swing arm assembly.
Save bolts, nuts, and washers for fastening flow meter assembly into place.
Step 2
Remove all old gaskets and clean surfaces of swing arm assembly flanges. Swing arm
assembly flanges must be clean and free of any contaminants.
Step 3
Install flow meter with new gaskets and grounding rings in correct positions. Flow meter
gauge must be free and clear of other parts of the 3 nozzle manure boom. Using bolts,
nuts, and washers from step 1 bolt the flow meter assembly to the swing arm assembly.
Step 4
Install mounting assembly and monitor in cab of tractor. Connect extension and connect
power cord.