34
Step
No.
Description
Picture
12
Setting
/Load Balance:
In this page the load balancing can be
configured
•
LoadBalance
Switch
:
load
balancing activation
•
Max House Current
: sets the
maximum
available
current
(power)
•
CANAddr
: sets the CAN address
for master/slave communication
between two chargers
•
Phase Set
: selects the phase to be
measured
Important note
: these parameters
shall be configured by qualified personnel
only
Содержание PLUS EV
Страница 1: ...Cabur PLUS EV Smart Chargers Installation and operating manual...
Страница 45: ...44 ENERGY METER RS 485 CAN...