2 / 24
SUMMARY
PREMISE
FEATURES
DIMENSIONS
STRUCTURAL ELEMENTS OF
MEDITERRANEA KIT
5. LAYING ON THE GROUND: TRACKING AND
EXCAVATION
6. LAYING ON A REINFORCED CONCRETE FOUNDATION
7. HOW TO ASSEMBBLY THE BASE STRUCTURE
8. CONNECTION TO THE VERTICAL STRUCTURE
ASSEMBLY OF THE INTERNAL STRUCTURE
10. STRUCTURE REALIZATION
THE OPERATING PRINCIPLE OF THE POOL HYDRAULIC CIRCUIT
12. THE IDRAULIC CIRCUIT REALIZATION
13. GUIDES LYING FOR ANCHORING THE PRE-WELDED LINER
14. LINER LAYING OF THE PVC LINER
EXTERNAL COATING INSTALLATION PROCEDURE
16. INSERTING OF THE SCREWS TO SUPPORT THE EXTERNAL PANELING
17. LYING UPPER COVERING
06/12/2019
Ver.00
MEDITERRANEA