EN

 

If this is the case, there is a leak in the jet 
system at the top of the filter. 

There must be mounted an aperture on the 
outlet to ensure pressure on the system, if the 
treated water goes directly to a reservoir.  

It would be advisable to contact BWT before 
commissioning, which will assist in answering 
any questions. 

4.1 

Handling and filling the ion 
exchange resin 

 

 

 

 

 

 

 

 

 

Before the softening unit can go into 
operation, fill in the supplied ion exchanger as 
follows: 

The amount of ion exchange resin should be 
divide into two equally.  

Remove the upper connection of the filter 
column via coupling and screw the remaining 
parts of (eg the top sprayer) connected to the 
tank. Disassemble the flange connection, by 
removing all M8 screws and the PVC adapter 
for the tank. 

Fill approx. 0.5-1 meters of water in the tank. 

Place a funnel in the top of the tank. First, fill 
the container with half of the ion exchange 
resin. Then fill the rest of the container with 
water. It is very important to use a 

submersible pump with plastic impeller to fil 
the rest of the container. 

In the top of the drawing a filling neck is 
displayed. This valve is for filling the last part 
of the Strong cation and the inert resin. 
Firstly, the top pip have to be removed so the 
water can over float when the resin is filled 
into the container. At the same time the 
nozzles have to mounted to makes sure that 
resin is not getting out together with the 
water.   

Now the actual filling of the resin can start. 
The water will over float the container has to 
be filled up completely  

When the container is full, the pipe should be 
mounted correctly again. Lubricate the O-ring 
with Vaseline or similar and reconstruct the 
upper compound. Adjust so that the 
connection ends with the link. 

Then open the valve for incoming water 

slowly 

to check for any leak. 

When this is done and the salt container is 
filled, a manual regeneration is performed to 
make sure everything is properly executed. 

After this check, the filter is set into operation. 

It is very important in order to secure good 
water quality that the amount of resin is 
correct.  

After 1 

– 2 months of operation BWT suggest 

that the amount of resin is controlled. 
Possibly fill extra if needed.   

Spilled ion exchange resin makes 
surfaces very slippery. 
 

4.2 

Filing of salt 

a.  Close the valve for the incoming water 

to the salt container. 

b.  Fill the salt container with salt tabs 

Figure 1 - Internals of a softening column

 

Содержание Rondomat HVD 1200

Страница 1: ...Rondomat HVD 400 1550 Softening Unit Installation and operation manual EN 659997220 EN 4...

Страница 2: ...u 8 5 1 2 Functions in the menu 8 5 2 Operation 9 5 2 1 Information in operation 9 5 2 2 Functions in Operation 9 5 3 Mimic 10 5 3 1 Information in Mimic 10 5 4 Auto Man 10 5 4 1 Information in Auto M...

Страница 3: ...ounters 13 5 11 Language 14 5 11 1 Information in Language 14 5 11 2 Functions in Language 14 5 12 Time and date 14 5 12 1 Information in time date 14 5 12 2 Functions in time date 14 5 13 Password 15...

Страница 4: ...ly low salt and water consumption during operation due to the built in conductivity measurement The system is controlled by a PLC so it is always possible to change the operating parameters The PLC is...

Страница 5: ...t rinse which displaces the salt solution through the ion exchanger The regeneration ends with a second flush that is controlled by the conductivity of the wastewater After 2nd flush the filter is aut...

Страница 6: ...yed This valve is for filling the last part of the Strong cation and the inert resin Firstly the top pip have to be removed so the water can over float when the resin is filled into the container At t...

Страница 7: ...EN 7 c Fill the salt container with water by opening the valve for incoming water Let the valve stay open for operation Figure 2 Salt Container Keep undissolved salt out of the tube...

Страница 8: ...Press Alarm settings Press Reg settings On the operating screen it is possible to start and stop the operation and regeneration On the mimic screen is indicated status of operation and valve pump On t...

Страница 9: ...ed Reg Timer Regeneration time in the activated step 5 2 2 Functions in Operation Press OFF ON Press Start Reg Press Step Reg Changes to alarm history where all alarm occurrences are stamped with time...

Страница 10: ...mps Pumps Black OFF White ON Valves Black closed White open 5 4 Auto Man 5 4 1 Information in Auto Manuel This function visualize the manual interference AUT MAN 5 4 2 Functions in Auto Manuel Selecte...

Страница 11: ...pr m Select options 5 6 Alarm settings 5 6 1 Information in Alarm Settings Delay of various alarms and set points for the conductivity in the second flush 5 6 2 Functions in Alarm Settings Setting di...

Страница 12: ...the hardness of the raw water It s possible change between dH fH and ppm CaCO3 The capacity in the Ion exchange resin preconfigured to 2 8 m3 Password See chapter 5 13 5 8 Alarm 5 8 1 Information in A...

Страница 13: ...Functions in Alarm Log By pressing the START button can the UP DOWN buttons be used to go through the registered alarms CLEAR ALL Deletes the log Password Se afsnit5 13 5 10 Counters 5 10 1 Informatio...

Страница 14: ...options 5 11 2 Functions in Language To select a language Press the preferred language 5 12 Time and date 5 12 1 Information in time date Date and time 5 12 2 Functions in time date Date and time can...

Страница 15: ...We recommend to use salt tablets or granulated vacuum salt if using a Saturator The plant is designed for a brine solution of 300g liter of water Frequently empty and rinse the salt container The qua...

Страница 16: ...After a prolonged period of closure take the following precautions Drain the filter containers for liquid and perform a double regeneration on the ion exchanger BWT Denmark A S offers various types of...

Страница 17: ...r 10 Pipe connection DN 50 100 Water connection DN 40 Height A mm 2520 2600 2800 2750 2800 Width B mm 2800 3000 3120 3550 4000 Depth C mm 1400 1500 1600 1800 1900 Height Salt container D mm 1120 Diame...

Страница 18: ...EN 18 9 Spare part drawing...

Страница 19: ...6 1 Once a year 12 Pressure gauge for reduc valve 200781108 13 Dist syst T 14 36 flange top 350244100 1 14 Dist syst T 24 flange bottom 350244108 1 15 Salt hose 5 8 401528050 1 16 Drain elbow 40537873...

Страница 20: ...EN 20 11 P I Diagram...

Страница 21: ...45 43 600 900 BWT BWT dk www BWT dk Here by declares that HVD 400 600 900 1200 1550 is in conformity with the provisions of the Machinery Directive Directive 2006 42 EC is in conformity with the provi...

Страница 22: ...__________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _____...

Страница 23: ...__________________________________________________________ _______________________________________________________________________________________ _____________________________________________________...

Страница 24: ...EN 24 Bwt com...

Отзывы: