background image

 

 

 

 

 

 

 
 
 

 
 

 
 
 
 
 
 
 
 
 
 

 

 

 
 

                                         

 

 

 

 

 

 

 
 
 
 
 

 
 

 

 
 

 

 
 

 

 

BWT PERMAQ

®

 

COMPACT 51 

Reverse Osmosis Plant 

 
 

 

 

 

 

Installation and Operating manual                        

UK

 

For You and Planet Blue. 

Содержание PERMAQ COMPACT 51

Страница 1: ...BWT PERMAQ COMPACT 51 Reverse Osmosis Plant Installation and Operating manual UK For You and Planet Blue...

Страница 2: ...UK 2...

Страница 3: ...e treated water is higher than 20 S cm 9 9 2 3 Alarm Low raw water pressure 10 9 2 4 Alarm Transport pump 10 9 2 5 Indication Level low 11 9 2 6 Alarm Level high 11 9 2 7 The plant is not operating 12...

Страница 4: ...d in our factory Your BWT PERMAQ Compact 51 plant is furnished with casters in a stainless frame That means that the plant can be placed e g under a table and pulled out for easy ser vicing Your BWT P...

Страница 5: ...e plant must be connected to a raw water pres sure of minimum 2 bar and maxi mum 7 bar The quality of the treated water will be less than 20 S cm at 10 C 5 WATER CONNEC TIONS Note All water connection...

Страница 6: ...ead the entire section 7 1 and 7 2 before adjustment is commenced Outlet amount must be adjusted and the suitable outlet amount on your plant depends on the raw water quality A too high water re cover...

Страница 7: ...tank is full NB Do not touch the level switch Create a large consumption of treated water to get the air out of the pump Check that the transport pump G Figure 3 starts up automatically Check that th...

Страница 8: ...e BWT PERMAQ Compact 51 plant is produced and designed for a minimum of servicing and maintenance However there are certain functions which should be checked regularly Maintenance intervals should be...

Страница 9: ...UK 9 9 2 Troubleshooting This section deals with the problems that may arise on the plant 9 2 1 The plant capacity has dropped 9 2 2 The quality of the treated water is higher than 20 S cm...

Страница 10: ...UK 10 9 2 3 Alarm Low raw water pressure 9 2 4 Alarm Transport pump...

Страница 11: ...UK 11 9 2 5 Indication Level low 9 2 6 Alarm Level high...

Страница 12: ...UK 12 9 2 7 The plant is not operating...

Страница 13: ...UK 13 9 2 8 Alarm The transport pump stops and starts 9 2 9 Hard water is measured at the soft water tap option...

Страница 14: ...condition Section 9 2 4 ALARM Too low raw water pressure Nothing is working permanent condition Section 9 2 3 Too low raw water pressure HP pump stopped TP pump is working Automatic restart 3 times if...

Страница 15: ...6 Transport pump 10 TECHNICAL SPECIFICATION 10 1 Technical specifications BWT PERMAQ Compact 51 Tag number Designation Type data P1 High pressure pump 14 bar 1x230V 0 64kW P2 Transport pump 1x230V 0...

Страница 16: ...V 230 Power consumption kW 1 5 Electricity frequency Hz 50 Pipe inlet diameter Concentrate outlet diameter 10mm hose Permeate outlet diameter Height mm 750 Depth mm 560 Width mm 350 Max water temp C...

Страница 17: ...oise until the warm water has run into the plant Then operate the plant in this way for 20 30 min until the plant components mem branes pumps are heated to approx 40 C Replace the wa ter in the bucket...

Страница 18: ...t also be installed so that the V cup seal has to be placed at the top when the membrane is fitted inside the membrane pipe When the membrane has been replaced and the end plate has been refitted with...

Страница 19: ...3 ANNEX 13 1 P I diagram 13 2 Layout drawings 13 3 Wiring diagram 13 4 Start up test 13 5 Operating journal 13 6 Spare parts list BWT PERMAQ Compact 51 13 7 Spare parts drawing 13 8 Declaration of con...

Страница 20: ...UK 20 13 1 P I Diagram...

Страница 21: ...UK 21 13 2 Layout Drawings...

Страница 22: ...UK 22...

Страница 23: ...UK 23...

Страница 24: ...UK 24...

Страница 25: ...UK 25 13 3 Wiring Diagrams...

Страница 26: ...UK 26...

Страница 27: ...UK 27...

Страница 28: ...of technician Date Time consumption for the start up hours Start up test The start up test sheet must be completed and filed together with the operating journal Test of raw water YES Time controlled...

Страница 29: ...arts List BWT PERMAQ Compact 51 Control of rawwater Pressure switch PS1 every 6 month Check up for leaks every month Softening plant option Hardness dH Raw water Raw water tempera ture C Raw water pre...

Страница 30: ...1404681 13 Push in fitting 14 mm elbow 1 454090014 3 years 14 Bypass valve 1 200721030 15 High pressure motor 451202495 16 High pressure pump 451202490 17 Coupling for high pressure pump 451202485 18...

Страница 31: ...451404215 2 years 36 Push in fitting 14x elbow 1 454090013 3 years 36A Push in fitting 10x elbow 1 454091010 3 years 37 End plate 1 451404112 3 5 years Miscellaneous 10 mm plastic hose 1 m 454001010 3...

Страница 32: ...UK 32 13 7 Spare Parts Drawing...

Страница 33: ...600 900 bwt bwt dk www bwt dk herewith declares that BWT PERMAQ Compact 51 is in conformity with the provisions of the Machinery Directive directive 2006 42 EC is in conformity with the provisions of...

Страница 34: ...________________________ ________________________________________________________________________________ ________________________________________________________________________________ _____________...

Страница 35: ...________________________ ________________________________________________________________________________ ________________________________________________________________________________ _____________...

Страница 36: ...00 Fax 33 1 4922 45 45 E Mail bwt bwt fr BWT Belgium NM Leuvensesteenweg 633 B 1930 Zaventem Tel 32 2 758 03 10 Fax 32 2 758 03 33 E Mail bwt bwt be BWE esk Republika s r o Lipovo 196 Cestlice CZ 251...