OPERATION
2647 01/11
Operation Section 4-29
© 2011 Alamo Group Inc.
OPERA
T
ION
It is important to keep the bucket level when
approaching a bank or pile. This will help prevent
gouging the work area.
PEELING AND SCRAPING
Use a slight bucket angle, travel forward and
hold lift control forward to start the cut. Make a
short 5 to 8 foot angle cut and break out cleanly.
With bucket level, start a cut at notch
approximately 2 inches deep. Hold depth by
feathering bucket control to adjust cutting lip up
or down. When front tires enter the notch, adjust
lift cylinder to maintain proper depth.
Содержание 2647
Страница 5: ...Safety Section 1 1 SAFETY SECTION ...
Страница 26: ......
Страница 27: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Страница 32: ......
Страница 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION ...
Страница 41: ...Operation Section 4 1 OPERATION SECTION ...
Страница 80: ......
Страница 81: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION ...
Страница 92: ...MAINTENANCE 2647 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE ...
Страница 93: ...MAINTENANCE 2647 01 11 Maintenance Section 5 13 2011 Alamo Group Inc MAINTENANCE ...
Страница 96: ...2647 SOM 01 11 P N 50069206 Printed U S A 2647 LOADER ...