BUSCH PANDA WZ 3600 A Скачать руководство пользователя страница 7

Storage | 4

0870203785_WZ3600A_-0001_IM_en

7 / 28

Machine weight:
see the technical data or the nameplate (NP)

• Check the machine for transport damage.

If the machine is secured to a base plate:

• Remove the machine from the base plate.

4

Storage

• Seal all apertures with adhesive tape or reuse provided caps.

• Make sure that the cooling water has been completely removed, see 

Decommission-

ing [

 23]

.

If the machine is to be stored for more than 3 months:

• Wrap the machine in a corrosion inhibiting film.

• Store the machine indoors, dry, dust free and if possible in original packaging

preferably at temperatures between -20 ... 55 °C.

5

Installation

5.1 Installation Conditions

NOTICE

Use of the machine outside of the permitted installation conditions.

Risk of premature failure!

Loss of efficiency!

• Take care that the installation conditions are fully complied with.

• Make sure that the environment of the machine is not potentially explosive.

• Make sure that the ambient conditions comply with the 

Technical Data [

 26]

.

• Make sure to use a suitable backing pump, if necessary seek advice from your Busch

representative

• Make sure that the environmental conditions comply with the protection class of the

motor and the electrical instruments.

• Make sure that the installation space or location is vented such that sufficient cooling

of the machine is provided.

Содержание PANDA WZ 3600 A

Страница 1: ...nstruction manuals service kits Instruction Manual PANDA Vacuum Booster WZ 3600 A 0870203785 0001_en Original instructions Modifications reserved 10 05 2021 Ateliers Busch S A Zone industrielle 2906 C...

Страница 2: ...ter Connection 9 5 3 Filling Oil 11 5 4 Electrical Connection 12 5 4 1 Wiring Diagram Three Phase Motor 13 5 5 Electrical Connection of the Monitoring Devices 14 5 5 1 Wiring Diagram Temperature Switc...

Страница 3: ...designed and manufactured according to state of the art meth ods Nevertheless residual risks may remain This instruction manual highlights potential hazards where appropriate Safety notes and warning...

Страница 4: ...I Cooling water inlet CWO Cooling water outlet CWC Cooling water connection EB Eye bolt IN Suction connection MP Magnetic plug MTB Motor terminal box NP Nameplate ODP Oil drain plug OFP Oil fill plug...

Страница 5: ...of air and other dry non aggressive non toxic and non explosive gases Conveying of other media leads to an increased thermal and or mechanical load on the machine and is permissible only after a consu...

Страница 6: ...ed motor 2 3 2 Temperature Switch The temperature switch monitors the oil temperature of the machine The machine must be stopped when the temperature switch trips 140 C 3 Transport WARNING Suspended l...

Страница 7: ...ng preferably at temperatures between 20 55 C 5 Installation 5 1 Installation Conditions NOTICE Use of the machine outside of the permitted installation conditions Risk of premature failure Loss of ef...

Страница 8: ...ke sure that the cooling water complies with the requirements see Cooling Water Connection 9 5 2 Connecting Lines Pipes Remove all protective covers before installation Make sure that the connection l...

Страница 9: ...ream from the machine Connection size s DN160 DIN 28404 Depending on the specific order other connection dimensions may apply 5 2 3 Discharge Connection Connection size s DN160 DIN 28404 Connection si...

Страница 10: ...the cooling water complies with the following requirements Min supply capacity l min 4 Water pressure bar 2 5 Supply temperature C 5 30 Required pressure differential across supply and return bar 1 T...

Страница 11: ...inappropriate oil Risk of premature failure Loss of efficiency Only use an oil type which has previously been approved and recommended by Busch For oil type and oil capacity see Technical Data 26 and...

Страница 12: ...from your Busch representative 5 4 Electrical Connection DANGER Live wires Risk of electrical shock Electrical installation work must only be executed by qualified personnel Make sure that the power...

Страница 13: ...r motor and temperature switches connection instructions diagrams 5 4 1 Wiring Diagram Three Phase Motor NOTICE The tightening torque does not comply with the recommendation Risk of damage the connect...

Страница 14: ...r connection low voltage Star connection high voltage 5 5 Electrical Connection of the Monitoring Devices NOTE In order to prevent potential nuisance alarms Busch recommends that the control system is...

Страница 15: ...ne compression chamber Risk of damage to the machine Do not lubricate the compression chamber of the machine with oil or grease NOTICE The machine is running at 90 Hz when starting a pump down cycle R...

Страница 16: ...soon as the target pressure is reached close the isolation and decrease the motor frequency to 30 Hz 6 2 Compression Chamber Flushing Depending on the process type very demanding application flushing...

Страница 17: ...the machine Open the gas supply Flush the machine When the flushing is finished Close the gas supply Dry the machine of flushing fluid Do not operate the machine in normal operating conditions with th...

Страница 18: ...operating conditions The intervals given below are considered as starting values which should be shortened or ex tended as appropriate Particularly harsh applications or heavy duty operation such as h...

Страница 19: ...sk of explosion If the oil becomes dark Contact your Busch representative without delay Make sure that the oil is either light or transparent If the oil becomes dark or looks different from the initia...

Страница 20: ...ce 20 28 0870203785_WZ3600A_ 0001_IM_en 1 5 2 3 2x 4 Drain pan Cleaning cloth Oil draining at the motor side Magnetic plug Magnetic plug 1 3 2 Drain pan Cleaning cloth Oil draining at the gear side Ma...

Страница 21: ...0001_IM_en 21 28 For oil type and oil capacity see Technical Data 26 and Oil 26 1 4 3 MAX MIN 2 B u s c h O i l Check oil level Oil filling at the motor side 1 4 3 MAX MIN 2 B u s c h O i l Check oil...

Страница 22: ...Wear appropriate personal protective equipment NOTICE Improper assembly Risk of premature failure Loss of efficiency It is highly recommended that any dismantling of the machine that goes beyond any...

Страница 23: ...the machine as scrap metal 10 Spare Parts NOTICE Use of non Busch genuine spare parts Risk of premature failure Loss of efficiency The exclusive use of Busch genuine spare parts and consumables is re...

Страница 24: ...r lines Seek advice from your local Busch representa tive The backing pump is not correctly defined Contact Busch The machine runs in the wrong direction Check the direction of ro tation see Wiring Di...

Страница 25: ...is black Oil change intervals are too long Drain the oil and fill in new oil see Oil Change 19 The machine runs too hot See problem The ma chine runs too hot For the solution of problems not mentioned...

Страница 26: ...0 Hz Blower nominal suction capacity m3 h 3600 Backing pump nominal suction capacity m3 h 720 360 360 Delta P max in continuous operation hPa 30 15 On request Delta P max in 50 duty hPa 30 15 On reque...

Страница 27: ...tandards Standard Title of the Standard EN ISO 12100 2010 Safety of machinery Basic concepts general principles of design ISO 13857 2019 Safety of machinery Safety distances to prevent hazard zones be...

Страница 28: ...Japan info busch co jp Korea busch busch co kr Malaysia busch busch com my Mexico info busch com mx Netherlands info busch nl New Zealand sales busch co nz Norway post busch no Peru info busch com pe...

Отзывы: