When the maintenance work has been finished, follow the procedure
“Safety Lockout procedure”:

take off the label or warning board “Maintenance processing”

check the oil level according to the chapter “Checking the oil
level”

switch on the main breaker

release the emergency stop button

switch on the water and nitrogen quick connections (outlet first,
then inlet)

make sure that the “Necessary installation instructions” are
followed

start the pump with the remote control (press on START button)

Maintenance program

NOTE

: The maintenance intervals depend on the operating conditions.

The following intervals are basic values, which can be shortened or
lengthened depending on operating conditions. In especially difficult
operating conditions such as, for example, a very dusty environment
the maintenance intervals must be shortened considerably.

Weekly:

l

Check the oil level and the colour of the oil (see “Checking the
oil”)

l

Check the cooling water flow (see “Checking the cooling water”)

l

Check the nitrogen flow (see “Checking the nitrogen”)

l

Inspect the vacuum pump for oil leaks - if there are leaks, repair
the vacuum pump (Busch)

l

Inspect the vacuum pump for leaks of cooling water - if there are
leaks, repair the vacuum pump (Busch)

Monthly:

In the case of operation in a dusty environment:

u

Make sure that the operating room is clean and free of dust;
clean if necessary

l

Make sure that the vacuum pump has been switched off and that
it cannot be switched on again accidentally

l

Check the electrical connections

l

Carry out a visual inspection of the vacuum pump

Yearly:

l

Make sure that the vacuum pump has been switched off and that
it cannot be switched on again accidentally

If the intake is equipped with a sieve:

u

Check the sieve at the intake and clean if necessary

l

Check the measuring and safety equipment for working order

If the discharge is equipped with a sound absorber:

u

Clean the sound absorber

If the discharge is equipped with a leak-protection non-return valve:

u

Clean the leak-protection non-return valve

If the cooling water line is equipped with a filter:

u

Check the filter and clean or replace if necessary

l

Check the seals and replace if necessary

l

Check the intake and discharge lines and clean or replace if
necessary

Every 16 000 hours of operation, at the latest
after 4 years:

l

Drain the oil (see “Draining the oil”)

l

A main inspection of the vacuum pump (Busch)

Lock Out/ Tag Out procedure

l

Stop the pump with the remote control (press on STOP button
during 10s)

l

Press on emergency stop button

l

Switch off the main breaker

l

Switch off the customer’s power supply

l

Switch off the water and nitrogen quick connections (inlet first,
then outlet)

l

Put the label or warning board “Maintenance processing” on or
next to the pump

Safety Lockout procedure

l

Take off the label or warning board “Maintenance processing”

l

Check the oil level according to the chapter “Checking the oil
level”

l

Switch on the main breaker

l

Release the emergency stop button

l

Switch on the water and nitrogen quick connections (outlet first,
then inlet)

l

Make sure that the “Necessary installation instructions” are
followed

l

Start the pump with the remote control (press on START button)

Checking the oil

Checking the oil level

l

Make sure that the vacuum pump has been switched off and that
it cannot be switched on again accidentally

l

Indication of the oil level on the oil sight glass

If the oil level does not reach the MIN marking:

u

Top up with oil (see “Refilling oil”)

If the oil level exceeds the MAX marking:

u

Check the condensate drain

l

Drain the oil (see “Draining the oil”)

Refilling oil

NOTE

: Oil does not normally have to be refilled outside the recom-

mended oil change intervals. A drop in the oil level indicates a fault
(see “Troubleshooting”).

CAUTION

Only fill in oil through the oil filler opening.

CAUTION

Danger of burns when the oil filler cap is open.

Danger of injuries when the oil filler cap is not screwed on properly.

Only unscrew the oil filler cap when the vacuum pump has been
switched off.

The vacuum pump may only be switched on when the oil filler cap
is properly closed and tight.

l

Make sure that the vacuum pump has been switched off and that
it cannot be switched on again accidentally

l

Unscrew the oil filler cap (OFP)

l

Fill in oil up to the middle of the oil sight glass

l

Make sure that the oil level lies between the MIN and MAX
markings on the oil sight glass

Maintenance

BC 0200 F

Page 16

0870767417 (En)

Содержание COBRA BC 0200 F

Страница 1: ...Instructions Screw Vacuum Pumps COBRA BC 0200 F Busch Manufacturing Korea Ltd 189 51 Soicheon ro Majang myun Icheon si Gyunggi do 467 813 Republic of Korea 0870767417 190605 Original instructions Subj...

Страница 2: ...tions on operation 14 Application 14 Switching the vacuum pump on off 15 First start up of the system 15 Switching the system off 15 Maintenance 15 Maintenance program 16 Weekly 16 Monthly 16 Yearly 1...

Страница 3: ...racket OFP Oil filler plug OSG Oil sight glass PS Discharge pressure switch CAO Extracting ventilator CPC PLC connection ES Emergency stop button EMO MB On Off switch Main circuit breaker RC LCD DGF D...

Страница 4: ...BC 0200 F Page 4 0870767417 En MB CPC DPS DGF DGR2 DGR1 PSA TS CWR CWM VFD...

Страница 5: ...not suitable for continuous duty at a pressure more or equal than 150 hPa mbar Caution the operating cycle of 150 hPa mbar must not exceed more than 5 min For other applications contact your Busch rep...

Страница 6: ...valve optional at the exhaust traps the condensate in the pump when the pump is switched off The LCD controller processes the data of the sensors see chapter Communication with the equipment as follo...

Страница 7: ...ntact exceed the limits in Table A5 1 of Appendix 5 SEMI S2 guideline Lock Out Tag Out procedure Type 1 of electrical work l Stop the pump with the remote control or with the stop button press on STOP...

Страница 8: ...ie the contactors open and remove power to motor S Cooling water flow low Water flowmeter B2 Depends on alarm function set in the PLC for water flow Set at factory General Stop ie the contactors open...

Страница 9: ...aws Appliance after warehousing Prior to reoperate a vacuum pump which remained outside the buiding for a certain period of time make sure to let it stand at ambient tempe rature in a room for a whole...

Страница 10: ...l must be disposed of in accordance with local and national regulations This handbook is contained in the delivery package Storage Temporary storage l Make sure that the intake and exhaust flanges are...

Страница 11: ...by the adjustment stroke 15 mm of the four machine foots l Make sure that the four rollers do not touch the ground NOTE In order to ensure the fixation of the pump to the ground it is possible to use...

Страница 12: ...nnection diameter 3 8 NPT Nitrogen connection The nitrogen is connected with a pipe leakproof against oxygen Connection diameter 1 4 NPT Electrical connection Checks l Make sure that the regulations o...

Страница 13: ...e installation handbook is of informative nature only Check the oil level with the help of the oil sight glass OSG on the vacuum pump CAUTION Before you change the type of oil make sure that the new t...

Страница 14: ...tain quantity of liquid If the pump has sucked in liquid a short drying time is necessary at the end of the procedure The allowed maximum inlet gas temperature depends on the inlet pres sure and the t...

Страница 15: ...minated with foreign materials that are dangerous to health the oil and condensates will also be contaminated These foreign materials can infiltrate the pores recesses and other internal spaces of the...

Страница 16: ...essary l Check the seals and replace if necessary l Check the intake and discharge lines and clean or replace if necessary Every 16 000 hours of operation at the latest after 4 years l Drain the oil s...

Страница 17: ...the sealing washer of the magnetic plug is not damaged replace it if necessary l Refit the magnetic plug and tighten up l Make sure that the sealing washer on the drain plug is undamaged and correctly...

Страница 18: ...that the various protective elements stoppers or adhesive tapes have been removed l Switch on the vacuum pump by following the procedure described in the chapter Installation and start up Dismantling...

Страница 19: ...ntaminated or polluted oil can lead to hazardous pump conditions which could cause personal injury Oil quantity The quantity of oil specified in the following table is of informative nature only Check...

Страница 20: ...Nominal motor speed min 1 4570 Noise level EN ISO 2151 dB A 60 Ambient temperature C F 10 40 32 104 Maximal counter pressure Discharge bar 0 2 Cooling water requirement l min min 2 0 Cooling water pr...

Страница 21: ...and electronic equipment and following the standards Standard Title of the standard EN ISO 12100 2010 Safety of machinery Basic concepts general principles of design EN ISO 13857 2008 Safety of machi...

Страница 22: ...Note...

Страница 23: ...Note...

Страница 24: ...myun Icheon si Gyunggi do 467 813 Republic of Korea Phone 82 31 645 2700 Fax 82 31 631 2898 e mail busch busch co kr Malaysia Busch Malaysia Sdn Bhd 4 6 Jalan Taboh 33 22 Seksyen 33 Shah Alam Technolo...

Отзывы: