background image

TECHNICAL PASSPORT INSTALLATION

and OPERATION MANUAL

EN

Model:

serial №:

v0.3

Solid fuel boiler

WBS Magna 160kW
WBS Magna 250kW

Содержание WBS Magna 160kW

Страница 1: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL EN Model serial v0 3 Solid fuel boiler WBS Magna 160kW WBS Magna 250kW...

Страница 2: ...ATING BOILER 8 6 1 Requirements 8 6 2 Assembly disassembly of the boiler housing 9 6 3 Check door tightness 10 7 SETUP OF THE HEATING BOILER 11 7 1 Connecting the boiler to a chimney 11 7 2 Connecting...

Страница 3: ...nd correct installation start up and trouble free operation and maintenance of the heating boiler The heating boiler can be used for heating rooms only in the manner described in this manual Take note...

Страница 4: ...ctions Customer must undergo boiler operation maintenance training by authorized installer service shop 1 2 2 Instructions to installation user DANGER of intoxication or explosion Toxic gases may be d...

Страница 5: ...minimum clearances in your country may differ from the ones specified bellow Please consult your installer The minimum distance from the heating boiler or exhaust gas pipe to objects or walls must be...

Страница 6: ...the input air to the combustion chamber an optimal operaing mode is achieved Efficient The flue gas makes a three pass movement around three water filled barriers in the combustion chamber on its way...

Страница 7: ...ng value of the most common wood species Wood species Energy contained in 1 kg kcal kJoule kWh Spruce 3900 16250 4 5 Pine 3800 15800 4 4 Birch 3750 15500 4 3 Oak 3600 15100 4 2 Beech 3450 14400 4 0 4...

Страница 8: ...pallet onto which the boiler is placed must be removed by unscrewing the bolted connections using flat ring wrench S13 WBS Magna A mm B mm C mm D mm Weight kg 250 kW 1000 2120 175 2310 1585 160 kW 900...

Страница 9: ...Boiler room must allow for continuous access of air necessary to maintain combustion Boilers must not be placed in inhabitable rooms All boiler rooms must have correctly calculated vent depending on t...

Страница 10: ...pcs 1 Lower side panel with insulation 2 2 Side middle panel with insulation 2 3 Upper right side panel with insulation 1 4 Upper left side panel with insulation 1 5 Back left panel with insulation 1...

Страница 11: ...p 7 Fix Back right panel 6 to panel 1 and panel 2 by using screws 5 16 mm Step 8 Fix Back left panel 5 to Back right panel 6 by using screws 5 16 mm Step 9 Fix Front lower panel 7 to panel 1 and panel...

Страница 12: ...connected to the chimney opening In terms of mechanical properties the flue outlet must be sturdy and properly sealed to avoid gas leak and allow for easy access for cleaning on the inside The inner s...

Страница 13: ...The required distance between the boiler and the chimney is 300 600 mm Diagram 5 Interdependence between boiler rated power and flue dimensions 7 2 Connecting the thermostatic draft regulator air flo...

Страница 14: ...gs no pressure allowed during work Connect the hot water outlet of the installation to connection B Connect the cold water outlet of the installation to connection A Mount the stopcock to drain outlet...

Страница 15: ...capacity while the fuel dries enough 3 Presence of deposits of soot and or tar in fume exhaust tubes of the water jacket of the boiler 3 Open the upper door and clean the heating surface of the exhau...

Страница 16: ...in a closed system Such connections must be performed by a technician service shop authorized for such operations Diagram 7 1 Thermostat 6 Hot water collector 2 Expansion vessel 7 Neating circuit 2 pu...

Страница 17: ...LLATION and OPERATION MANUAL 16 EN 7 4 2 Connection of BURNiT WBS Magna boiler in an open system Diagram 8 1 Cold water inlet 5 Return valve 2 Drainage 6 Insulation 3 Air vent line 7 Hot water outlet...

Страница 18: ...ignition the boiler When ignition the boiler for the first time a condensate is formed which is later drained this isnot a fault in the boiler The fuel is loaded through the door of the combustion ch...

Страница 19: ...the boiler to be cleaned by authorized service It is also recommended to throw out the ash from the combustion chamber each 3 to 5 days depending of the fuel used Scrape the inside of flue pipes if n...

Страница 20: ...e a mixing valve must be installed and it must be adjusted so that the minimum temperature of the water returning in the boiler is 65 This extends the life span of the boiler and its warranty The oper...

Страница 21: ...bustion chamber with three way traffic of the exhaust gases through the smoke pipes protected by a water jacket Easy cleaning of the fume exhaust tubes thanks to the inspection door in the upper part...

Страница 22: ...otlet 9 Transportation openings 2 Safety line sleeve 10 Air intake door 3 Thermal wool insulation 11 Opening for mounting a burner with protective cover 4 Fume exhaust tube 12 Loading door 5 Mantle 13...

Страница 23: ...at output kW 160 250 Heating surface m 1200 1600 2000 2500 Height H mm 1800 2150 Width L Depth D mm 850 1880 950 2070 Mantle volume L 500 790 Combustion chamber volume L 350 560 Combustion chamber res...

Страница 24: ...nsulation Kg kg 1100 1170 1550 1630 Cold water inlet A mm DN 80 250 DN 80 245 Hot water outlet B mm DN 80 1880 DN 80 2100 Safety line sleeve 1 mm 2 mm DN 40 1880 DN 40 500 DN 40 2100 DN 40 500 Flue F...

Страница 25: ...ocessing to an authorized factory which complies with the environmental protection regulation 12 2 Recycling and waste disposal At the end of life cycle of each product its components are due to be di...

Страница 26: ...25...

Страница 27: ...26...

Страница 28: ...UREAU VERITAS Certification BG119996Q 12 Madara Blvd 9700 Shumen Bulgaria t 359 54 874 555 f 359 54 874 556 e mail ftrade sunsystem bg 129 Vitosha Blvd 1000 Sofia Bulgaria t 359 02 952 24 05 f 359 02...

Отзывы: