background image

Installation / Service / User Manual

                                                                          BURNERTECH 

 
 

19 

 

6.2

 

Service operation 

 

 

Burner head

  

The burner head should be examined carefully for cracks and/or damage. If there are signs that there has been 
over heating of the material or dust on the burner face, the burner head must be removed from the burner. 
Close examination of the silver foil at the rear of the inside of the burner head should be done and if all is 
okay, the inside of the Inverterjet burner head should be blown out using compressed air.  

If the inside of the burner head is found to be severely blocked with dust and dirt please examine 
the burner material more closely. It is likely that the burner head material will have overheated due 
to the blockage and will be blackened in appearance and may need replacing. If so, the customer 
must be advised to protect the burner from dust ingress and/or increase the service intervals. 
 

 

 

Electrodes

 

Inspect the ignition and flame electrodes, if extensive signs of damage are detected, they must then 
be removed and replaced. 
 

Fan 

The fan is not a serviceable component. Simply ensure it is positively secured and sealed. The 
gasket material, electrical plug connections and cover must be secure and in good condition.  
The fan case has gas tight seals and the fan casing must never be opened. Due to the 1:1 gas/ air 
ratio operating principle of the burner a reduction in fan performance (i.e. dust build up) will not 
result in unsafe burner performance.  
The gas flow is directly proportional to the air flow therefore any reduction in fan flow would simply 
result in a gradual reduction of the appliance heat input. 

 

 
Venturi Unit 

Examine and clean the Venturi unit checking that it is securely attached, and that any gasket is in 
good condition. Ensure that any Air Pressure Sensing point is secure and unobstructed (if fitted).

 

 

Cleaning: 

Using a cloth, soft brush and vacuum, carefully remove any dust and grime from the 

whole burner assembly taking care not to disturb electrical connections.  
 

 

 

6.2.1 

Re-assembly 

Using a new replacement gasket, carefully and securely slide it to the burner head up until the 
gasket and the mounting plate are in contact. carefully refit the burner system into the appliance 
combustion chamber and secure using the fixings.  
Re-connect gas and electrical connections. 
Check for gas soundness as detailed by Local, National Standards and Regulation

s and turn ‘ON’ 

the Gas and Electrical supplies.  
 
Finally check and record the combustion and ventilation performance of the burner. Check the basic 
operation/control of appliance before restoring automatic control to any Boiler Management System 
(if applicable). 

Содержание INVERTERJET 30M/L

Страница 1: ...bject to Modifications MODEL PRODUCT CODE CLASS INVERTERJET 30M L 91353 MODULATING PRE MIX BURNER INVERTERJET 30M N 91354 MODULATING PRE MIX BURNER INVERTERJET 50M L 91320 MODULATING PRE MIX BURNER IN...

Страница 2: ...4 Commissioning 12 4 1 Commissioning procedure 12 4 1 1 Turning on the Burner 13 4 1 2 Commissioning operation 13 4 1 2 1 Maximum rate CO2 13 4 1 2 2 Minimum rate CO2 13 4 1 2 3 Burner Heat Input 13 4...

Страница 3: ...ility we advise and request that a Burnertech Approved Engineer who has attended our product course conducts the 1st burner commissioning For Training Service or Commissioning information please conta...

Страница 4: ...Installation Service User Manual BURNERTECH 3...

Страница 5: ...Max A 0 3 1 9 1 9 Gas Connection Flange Size 1 2 BSP 1 2 BSP 1 2 BSP Gas Inlet Pressure Min mbar 10 10 10 Max mbar 60 60 60 2 2 Technical Description of the Burner Parts The Burners in the Inverterje...

Страница 6: ...ght mm mm mm mm mm mm mm mm mm kg Inverterjet 30M L 89 71 91 101 6 170 133 218 361 225 5 2 Inverterjet 30M N 89 71 91 101 6 170 133 218 361 225 5 2 Inverterjet 50M L 92 71 91 101 6 170 164 244 365 238...

Страница 7: ...d ten volts can be applied to connector X3 Pins 8 16 At zero volt the fan will run on Minimum Fan speed At ten volt the fan will run on Maximum Fan speed 4 20 mA control with an external resistor of 5...

Страница 8: ...Installation Service User Manual BURNERTECH 7 3 Installation 3 1 General Installation Information...

Страница 9: ...sealing and insulating between the Mounting Plate and the bearing wall of the appliance 3 2 1 Standard Burner Mounting Detail 1 Burner Head 2 Burner Mounting Gasket 3 Boiler Door MODEL C D1 D2 G PCD...

Страница 10: ...front of the Gas connection flange at the rear of the burner 2 Check the thread on the flange and ensure that there is no debris in the threads 3 Connect the corresponding gas pipe fittings to the Gas...

Страница 11: ...Installation Service User Manual BURNERTECH 10 3 4 Electrical Installation The electrical wiring diagram for the Burners are shown in the following page 3 5 Basic Electrical Safety...

Страница 12: ...fit connector is used for communication via a dedicated Windows based PC software and USB lead Please contact Burnertech for more information An Earth must be connected to the 6 3mm spade connector on...

Страница 13: ...g procedure follow the steps bellow 1 Connect a Manometer to the gas inlet pressure test nipple on the burner gas inlet connection 2 Locate CO CO2 combustion analyser into flue pipe as close as possib...

Страница 14: ...5 CAUTION Generally the CO2 should not normally exceed 9 5 on NG or 11 on LPG We recommend that the operating CO2 is between 0 to 0 5 higher at maximum fan speed than at minimum 4 1 2 2 Minimum rate...

Страница 15: ...during a complete burner sequence The basic states are Stand by fan is off or at Continuous Fan speed when this option is selected Pre purge Ignition Run state fan speed is controlled by modulation i...

Страница 16: ...mmunication 4 1 3 1 PC USB Interface If required a windows based software along with a dedicated USB cable and driver is available to enable programming of certain parameters in the control and also t...

Страница 17: ...Installation Service User Manual BURNERTECH 16 5 User Instructions 5 1 Limitations on use of Burner...

Страница 18: ...uous Fan speed option is switched off 5 2 3 Heating Mode The normal heating mode is started when a high voltage heat demand input is closed When ignition is successful the fan can be controlled betwee...

Страница 19: ...m the chamber 6 1 1 The condition of the burner head some discolouration of the burner material is normal but the material should not be cracked or open Under no circumstances should any of the perfor...

Страница 20: ...ion The fan case has gas tight seals and the fan casing must never be opened Due to the 1 1 gas air ratio operating principle of the burner a reduction in fan performance i e dust build up will not re...

Страница 21: ...alse Flame Indication Error is created if flame current is detected in illegal situations no heat demand currently present gas valve closed safety time passed This error condition requires manual rese...

Страница 22: ...Installation Service User Manual BURNERTECH 21 6 3 2 Maintenance Notes...

Страница 23: ...Installation Service User Manual BURNERTECH 22...

Страница 24: ...C Lostock Industrial Estate Lostock Lane BL6 4BL Bolton United Kingdom Tel 44 0 1204 393222 Fax 44 0 1204 394222 Email enquiries burnertech co uk Website www burnertech co uk 99043 1 28 11 2019 Subje...

Отзывы: