
The Contractors Choice
thermOweld
®
ECN 2552 REV "K" 03/05/13 34-5381-17
+1 (918) 627-5210 • 1-800-558-1373 • WWW.THERMOWELD.COM
ELECTRICAL GROUNDING • CATHODIC PROTECTION • ELECTRIC UTILITY • RAIL
Tel. +1.800.558.1373
Tel. +1.918.627.5210
www.thermoweld.com
INSTRUCTIONS FOR THERMOWELD GROUNDING CONNECTIONS - CABLE TO CABLE
CC-8 & CC-9
Butt tap cable against run cable.
CC-13
Place end of tap cable to center of
tap hole and place run cable into
mold.
CC-26
Butt cables together under center of tap hole as
shown. Do not insert either cable until they contact
weld cavity.
CC-40
Butt tap cables against run con-
ductor as shown.
CC-17
Butt tap cable against run cable.
CC-18
Butt tap cable against run cable.
CC-27
Butt cables together under center of tap
hole as shown. Do not insert either cable
until they contact weld cavity.
CC-28
Butt cables together under center of tap
hole as shown. Do not insert either cable
until they contact weld cavity.