
2702 - 21
C
ommissioning
english
eleCtRICal ConneCtIon - teRMInals foR Cable bUshIng
(toP
CONTROL
tYPe 8630)
Remove the cover with the cable bushings to gain access
to the screw terminals. This is done by unscrewing the
4 self-tapping screws.
Connection PCb of the toP
Control
Continuous with screw terminals and
jumpers
terminal configuration with cable bushings
attentIon!
For connection to the technical earth (ground) (TE), a threaded stud with nut is provided
on the connection module. To assure electromagnetic compatibility (EMC), connect this
stud to a suitable earthing (grounding) point using as short a cable as possible
(max. 30 cm).
Use of the 4 - 20 mA setpoint input
If the voltage supply of a TOP
Control
Continuous device fails in a row of such devices con-
nected in series, the input of the failed device will become high-impedance. This will cause the
4 - 20 mA standard signal to fail. If this occurs, please contact Bürkert Service directly.
note
terminal allocation
external connection
1
2
Se
Setpoint GND
1
2
+ (0/4 ... 20 mA or 0 ... 5/10 V)
GND
3
4
Analog position fe
Analog position feedback GND
3
4
+ (0/4 ... 20 mA or 0 ... 5/10 V)
completely isolated electrically
GND
5
6
Operating v
Operating voltage GND
5
6
24 V DC ± 10 %
max. residual ripple 10 %
Содержание 2702
Страница 39: ...2702 39 Technische Daten deutsch Aufbau des Regelventils 40 Medien 40 Kv Werte 41 Technische Daten ...
Страница 93: ......
Страница 94: ...www burkert com ...