FACTORY SET VOLTAGE 115 V
CONNECTION VOLTAGE
CHANGING:
Before changing the
voltage connection:
A) Ensure the power to
the pump is disconnected.
B) Open motor junction box cover.
C) Please select the up knob
position for 115V or down
knob position for 230V.
D) Connect to appropriate voltage.
E) Close motor junction box.
WWW.BURCAM.COM
2190 Boul. Dagenais West
TEL: 514.337.4415
LAVAL (QUEBEC)
FAX: 514.337.4029
CANADA
H7L 5X9 [email protected]
Your pump has been carefully packaged at the
factory to prevent damage during shipping.
However, occasional damage may occur due
to rough handling.
Carefully inspect your
pump
for damages that could cause failures.
Report any damage to your carrier or your
point of purchase.
INSTALLATION
INSTRUCTIONS
MODELS
503121S/503221S
AND
BY- PRODUCTS LIKE
503127S, 503128S,
503228S, 503131S,
503231S, ETC.
JET PUMP
Please read these
instructions
carefully.
Failure
to comply to
instructions and
designed
operation of
this system,
may
void
the warranty.
© 2014 BUR-CAM Printed in Canada 510059
Suction connection
Discharge connection
PRIMING PROCESS
Follow all these inside step by step instructions to install your pump. Use teflon tape on
all threads. (1) Fill the suction line with water and connect it to the suction inlet.
(2) Remove the priming plug and fill the pump body with water. (3) Screw the plug to
the priming inlet. (4) Turn the power on. The pump should deliver water to the plumbing
line within 30 seconds. If not, unplug the pump and repeat the process at step 2.
4
1
2-3