Содержание WM96
Страница 3: ...3 PART LIST CBL1 TENSION CABLE FM2 FM3 FM4 FM5 FLOOR MOUNT FIXTURE FM6 1 2 3 4 5 6 CHROME BRACKET...
Страница 6: ...6 2 Push cables through holes on top of bracket CABLE...
Страница 7: ...7 3 Add plumb line to cable as shown or use a laser leveler to mark spots for drilling anchor holes...
Страница 8: ...8 4 Drill holes in floor as shown below...
Страница 9: ...9 5 Mount floor fixture FM1 into floor as shown below...
Страница 11: ...7 Add all Wooden Rods to cables as shown 11...
Страница 14: ...14 Tighten FM2 to FM1 as shown below This will add tension to the cable and stabilize the fixture 10...
Страница 15: ...15 11 Adjust wooden rod to the position needed and use WR3 to keep in position...
Страница 16: ...16 Use a leveler tool to ensure wooden rods are horizantal ly levelled Adjust WR3 if needed 12...
Страница 17: ...13 17 Insert WR5 chrome tubes into wooden rods and use WR6 screws to hold tubes in position as shown above...
Страница 18: ...14 18 Add all remaining chrome tubes and screws to your Buoyant Cable Wine System section ENJOY...
Страница 19: ...COMPLETED ASSEMBLY 19...