6
Electrical Hook-Up
CAUTION
Improper electrical installation will damage
electronic components.
1. An electrician must provide electrical service
as specified.
2. Using a voltmeter, check the voltage and
color coding of each conductor at the
electrical source.
3. Connect the dispenser to the power source
(plug it in).
4. Locate the switch at the rear of the machine and
flip the power switch to the "ON" position
NOTE: The boot-up sequence may take
60-90 seconds, and the machine will cycle in
preparation for operation. The door must be
closed, or the door interlock engaged at power up.
5. If plumbing has been hooked up, the dispenser
will auto-fill and heat.
6. After the boot-up sequence is complete, open
the door and remove the cardboard shipping
pad from the top of the brew box.
INITIAL SETUP
POWER SWITCH
LOCATION
(back of machine)
Cardboard Shipping Pad before boot-up
Cardboard Shipping Pad after boot-up
(remove after boot-up)
- FOR INDOOR USE ONLY -
Configuration
120V Configuration:
This electrical service consists of 2 current carrying conductors
(L1 and Neutral) and a separate conductor for chassis ground.
120-208/240V Configuration:
This electrical service consists of 3 current carrying conductors
(L1, L2 and Neutral) and a separate conductor for chassis ground.
continued >
X
W
Y
G
120-208/240V Models
120V Models
PN 26367.0000
1/4 inch Cleaning Brush
PN 42933.0001
Sure Immersion Cleaning Tablets
PN 50766.0001
Paper Roll
PN 53465.0000
Micro Fiber Cleaning Cloth
PN 52444.0020
Door and Bean Hopper Key
PN 53493.0000
Small Cleaning Brush
ACCESSORIES